Austria - General Information: Difference between revisions

From EGTRE
Jump to navigationJump to search
(→‎Threatened passenger lines: 132 Waidhofen/Ybbs to Gstadt added)
(174 intermediate revisions by 9 users not shown)
Line 5: Line 5:
===National Railway Operator===
===National Railway Operator===
Österreichische Bundesbahnen ([http://www.oebb.at ÖBB]).
Österreichische Bundesbahnen ([http://www.oebb.at ÖBB]).
===Infrastructure Authority===
[http://www.oebb.at/infrastruktur/en/ ÖBB-Infrastruktur AG].


==Language==
==Language==
Line 20: Line 17:
== Timetable ==
== Timetable ==
===Journey Planner===
===Journey Planner===
[http://fahrplan.oebb.at/bin/query.exe/en? fahrplan.oebb.at/bin/query.exe/en?]
[http://fahrplan.oebb.at/bin/query.exe/en? ÖBB 'Scotty' Journey Planner]


===Downloadable Timetable===
===Downloadable Timetable===
Individual tables can be downloaded at http://www.oebb.at/de/Reiseplanung/Fahrplanauskunft/Fahrplanbilder/index.jsp . An offline journey planner can also be downloaded at http://www.oebb.at/en/Planning_your_trip/Timetable/Offline_timetable_version/index.jsp
Individual tables can be downloaded [http://www.oebb.at/de/strecken-fahrplaninfos/fahrplanbilder here] (table numbers can be found from this [https://www.oebb.at/file_source/reiseportal/strecken-fahrplaninfos/Fahrplanbilder/Bahnnetz.pdf route plan]). An offline journey planner can also be downloaded [http://www.oebb.at/en/Planning_your_trip/Timetable/Offline_timetable_version/index.jsp here].


===Printed Timetable===
===Printed Timetable===
Because of a court decision arising out of the fact that the new WESTbahn services were not included in their 2011/12 printed timetable, ÖBB no longer publish one.
ÖBB no longer publish a complete printed timetable, but do issue timetable booklets for each route (usually available only in the area in question). Table numbers can be found from this [https://www.oebb.at/file_source/reiseportal/strecken-fahrplaninfos/Fahrplanbilder/Bahnnetz.pdf route plan].


===Engineering Information===
===Engineering Information===
[http://fahrplan.oebb.at/bin/help.exe/dn?tpl=showmap_external fahrplan.oebb.at/bin/help.exe/dn?tpl=showmap_external] provides a pictorial map giving the location and type of engineering work and other incidents for ÖBB also significant events on neighbouring railway administrations.
[http://fahrplan.oebb.at/bin/help.exe/dn?tpl=showmap_external This page] provides a pictorial map giving the location and type of engineering work and other incidents for ÖBB, and also significant events on neighbouring railway administrations.
 
A map of the network showing the locations and dates of engineering works in 2016, by quarter, is present  [http://www.oebb.at/infrastruktur/__resources/llShowDoc.jsp?nodeId=56366980 here].
 
A map of the network showing the locations and dates of engineering works in 2017, by quarter, is present  [http://www.oebb.at/infrastruktur/__resources/llShowDoc.jsp?nodeId=68079643 here].
 
The summer provides opportunity for engineering work which can result in sections of line being closed, with and buses substituted,  for many weeks: it pays to check carefully.


===Bus Information===
===Bus Information===
Line 39: Line 42:
*“''Eisenbahnatlas Österreich''”, the second edition of which (ISBN 3-89494-138-3) was published in 2010 by [http://www.schweers-wall.de Verlag Schweers + Wall GmbH], similar to atlases from the same publisher for Germany, Italy & Slovenia, and Switzerland.  
*“''Eisenbahnatlas Österreich''”, the second edition of which (ISBN 3-89494-138-3) was published in 2010 by [http://www.schweers-wall.de Verlag Schweers + Wall GmbH], similar to atlases from the same publisher for Germany, Italy & Slovenia, and Switzerland.  
*European Railway Atlas: Denmark, Germany, Austria, Switzerland by M.G. Ball (1993) (ISBN 0-7110-2116-3)
*European Railway Atlas: Denmark, Germany, Austria, Switzerland by M.G. Ball (1993) (ISBN 0-7110-2116-3)
*[http://www.europeanrailwayatlas.com/index.html European Railway Atlas] by M.G. Ball (2008 onwards)
*[http://www.europeanrailwayatlas.com European Railway Atlas] by M.G. Ball (2008 onwards)


===Web-based Maps===
===Web-based Maps===
*An overall system map dated 2018/19 is provided at [https://infrastruktur.oebb.at/de/geschaeftspartner/schienennetz/dokumente-und-daten/netzkarten/dokument?datei=Karte+VzG+Strecken%C3%BCbersicht+%28SNNB+2019%29 OEBB INFRA Map].
*[http://www.sporenplan.nl/ Sporenplan] has a number of on-line schematic track diagrams. Click on "Sporenplannen" on the left hand side for a map showing the countries covered.
*[http://www.sporenplan.nl/ Sporenplan] has a number of on-line schematic track diagrams. Click on "Sporenplannen" on the left hand side for a map showing the countries covered.
*Thorsten Büker's [http://www.bueker.net/trainspotting/maps_austria.php Map of Austria] and [http://www.bueker.net/trainspotting/maps_vienna-area.php Map of Vienna].
*Thorsten Büker's [http://www.bueker.net/trainspotting/maps_austria.php Map of Austria] and [http://www.bueker.net/trainspotting/maps_vienna-area.php Map of Vienna]. Not updated since November 2011.
*[[Maps and Plans#Austria|Maps and Plans - Austria]]
*[[Maps and Plans#Austria|Maps and Plans - Austria]]


==Gauge==
==Infrastructure==
Mostly standard gauge, but the following lines are narrow gauge:
===Infrastructure Authority===
Infrastructure is owned and managed by a public authority, [http://www.oebb.at/infrastruktur/en/ ÖBB-Infrastruktur AG].
 
===Network Statement===
The [http://www.oebb.at/infrastruktur/en/_p_Network_Access/NetworkStatement/index.jsp Network Statement] page gives access to the latest network statements.


* 760mm gauge: 115 St Polten – Mariazell; 132 Waidhofen a d Ybbs – Gstadt; 801 Gmünd NÖ – Groß Gerungs; 802 Gmünd NÖ – Litschau and Heidenreichstein
===Gauge===
* Metre gauge (and rack operated): 523 Puchberg am Schneeberg – Hochschneeberg (see below regarding ownership).  
ÖBB is entirely standard gauge. Various Other Railways are narrow gauge, as noted below.
* Various private lines are narrow gauge, as noted below.


==Electrification==
===Electrification===
15 kV 16.7 Hz. The St Polten – Mariazell line is electrified at 6.6 kV 25 Hz. Electrification systems used by private lines are noted below. The following cross-border routes with Hungary are electrified at the Hungarian standard 25 kV 50 Hz:
15 kV 16.7 Hz. The electrification systems used by Other Railways are noted below. The following cross-border routes with Hungary are electrified at the Hungarian standard 25 kV 50 Hz:


* between Ebenfurth and Deutschkreutz via Sopron (Ebenfurth station area can be switched between the two voltages);  
* between Ebenfurth and Deutschkreutz via Sopron (Ebenfurth station area can be switched between the two voltages);  
* between Neusiedl am See (exclusive) and Fertöszentmiklós (the electrification boundary is a few hundred metres south of Neusiedl station).  
* between Neusiedl am See (exclusive) and Fertöszentmiklós (the electrification boundary is a few hundred metres south of Neusiedl station).


==Rule of the road==
===Rule of the road===
Many lines are single track and most double track railways are signalled for reversible working. Most double track lines in Austria operate with right-hand running, although many lines in the east of the country once operated with left-hand running, a hangover from the days of the Austro-Hungarian Empire. The Wien to Graz line and the Wien S Bahn system still operate with left-hand running, although the Wien to Salzburg line was converted some years ago.
Many lines are single track and most double track railways are signalled for reversible working. Most double track lines in Austria operate with right-hand running, although many lines in the east of the country once operated with left-hand running, a hangover from the days of the Austro-Hungarian Empire.
The following lines converted to right-hand running on 6 August 2012:
 
*Wien Floridsdorf – Bernhardsthal (Bernhardsthal – Břeclav ČD will convert on 9 December 2012)
The Wien to Graz line still operates with left-hand running south of Payerbach-Reichenau, but Payerbach-Reichenau - Mürzzuschlag - Bruck a d Mur will convert to right-hand running in December 2019. ÖBB intends to convert Bruck a d Mur - Graz by the time the <i>Koralmbahn</i> opens in full. The only other line with left-hand running is Wien FJB - Tulln - Absdorf-Hippersdorf, an isolated section of double track which will probably be left.
*Wien Rennweg – Flughafen
 
*Wampersdorf – Wiener Neustadt Civitas Nova
===Distances===
*Wien Hbf – Payerbach-Reichenau
The best source is the “''Eisenbahnatlas Österreich''”; see [[#Printed Maps]].
*Wien Hütteldorf/Penzing – Wien Meidling
*Wien Meidling – Wien Floridsdorf
*Wien Floridsdorf – Stockerau
*Wien Süßenbrunn – Wolkersdorf
ÖBB intends to convert most of the remaining lines - apart from Mürzzuschlag - Bruck a d Mur - Graz, as major investment would be required. The only other line with left-hand running is Wien FJB - Tulln - Absdorf-Hippersdorf, which is an isolated section of double track.


==Other Railways==
==Other Railways==
Table numbers in the Fahrpläne Österreich are shown in brackets
Many of these are government (regional or local) owned, rather than owned by private companies. Table numbers in the Fahrpläne Österreich are shown in brackets and can also be found from [https://www.oebb.at/file_source/reiseportal/strecken-fahrplaninfos/Fahrplanbilder/Bahnnetz.pdf this plan].
 
*[http://www.gkb.at Graz-Köflacher Eisenbahn]: Graz Hbf – Köflach and Wies-Eibiswald (550)
 
*[http://www.montafonerbahn.at/verkehr/fahrplan_bahn.shtml Montafonerbahn AG]: Bludenz – Schruns (420). Electrified 15 kV 16.7 Hz
*[http://www.noevog.at/en/default.asp NÖVOG (Niederösterreichische Verkehrsorganisationsges.m.b.H.)] 
**St Polten Hauptbahnhof – Mariazell <i>Mariazellerbahn</i> (115) (760mm gauge) Electrified at 6.6 kV 25 Hz.
**Waidhofen an der Ybbs – Gstadt bei Waidhofen <i>Citybahn Waidhofen</i> (132) (760mm gauge)
**Puchberg am Schneeberg – Hochschneeberg [http://www.schneebergbahn.at <i>Schneebergbahn</i>] (523) (Metre gauge, rack operated) **Gmünd NÖ – Groß Gerungs <i>Waldviertelbahn</i> (801) (760mm gauge)
**Gmünd NÖ – Litschau and Heidenreichstein <i>Waldviertelbahn</i> (802) (760mm gauge)
**Krems an der Donau - Emmersdorf an der Donau <i>Wachaubahn</i> (811)
**Retz - Drosendorf <i>Reblaus Express</i> (941)
 
*[http://www.raaberbahn.at Raab-Oedenburg-Ebenfurter Eisenbahn AG]: An international railway in joint Austrian and Hungarian ownership, better-known by its Hungarian name, Györ-Sopron Ebenfurti Vasút (GySEV). Raab and Oedenburg are the German names for Györ and Sopron respectively. The line from Ebenfurth to Sopron is electrified at 25 kV 50 Hz and used by dual-frequency ÖBB trains between Sopron and Wien Südbf. GySEV also owns the line between Sopron and Györ, which is entirely in Hungary and electrified at 25 kV 50 Hz.
**Ebenfurth – Sopron (512)
**Neusiedl am See – Fertószentmiklós (731).
 
*[https://www.salzburg-ag.at/ Salzburg AG]:
**St Wolfgang Schafbergbahnhof – Schafbergspitze [http://www.schafbergbahn.at/en_uk.html <i>SchafbergBahn (Salzkammergutbahn GmbH)</I>] (173) (metre gauge, rack operated)
**Salzburg Hauptbahnhof (platforms 11 and 12) - Lamprechtshausen [http://www.slb.at <i>Salzburger Lokalbahn</i>] (210). Electrified 1000 V dc.
**Bürmoos – Trimmelkam – Ostermeithing [http://www.slb.at <i>Salzburger Lokalbahn</i>] (210). Electrified 1000 V dc.
**Zell am See – Krimml [http://www.pinzgauerlokalbahn.at/content/website_pinzgauerlokalbahn/en_uk.html <i>Pinzgauerbahn</i>] (230) (760 mm gauge)
 
*[http://www.stlb.at Steiermärkische Landesbahnen (STLB)]:
**Gleisdorf – Weiz Nord (531)
**Feldbach – Bad Gleichenberg (532) Electrified 1000 V dc
**Peggau-Deutschfelstritz – Ubelbach (540) Electrified 15 kV 16.7 Hz
**Unzmarkt – Tamsweg <i>Murtalbahn</i> (630) (760 mm gauge) <i>Plans to convert this line to standard gauge have been abandoned, but see ​"Projects under way or planned", below.</i>.
**Mixnitz – St Erhard (760 mm gauge) Electrified 800 V dc. This line is owned by Mixnitz-St.Erhard AG, a wholly owned subsidiary of Veitsch-Radex GmbH, but managed by STLB. It is possible to charter passenger trains or passenger coaches on freight trains.
**Weiz – Anger - Birkfeld (760 mm gauge) <i>line sold - see Recent Changes, below</i>
 
*[http://www.stern-verkehr.at Stern & Hafferl Verkehrsgesellschaft m.b.H.]:
**Linz Hbf – Peuerbach and Neumarkt-Kalham <i>LILO</i> (143) Electrified 800 V dc, operated by dual-system EMUs into Linz Hbf on 15 kV 16.7 Hz
**Lambach – Vorchdorf-Eggenberg (160)
**Vorchdorf-Eggenberg – Gmunden Seebf (161) (metre gauge) Electrified 800 V dc
**Vöcklamarkt Lokalbahn – Attersee (180) (metre gauge) Electrified 800 V dc
**Vorchdorf-Eggenberg – Brauerei Eggenberg (freight only).


*Graz-Köflacher Eisenbahn: Graz Hbf – Köflach and Wies-Eibiswald (550) [http://www.gkb.at www.gkb.at]
*[http://www.ivb.at Stubaitalbahn (Innsbrucker Verkehrsbetriebe und Stubaitalbahn G.m.b.H.AG)]: Innsbruck – Fulpmes (320) (Metre gauge) Electrified 900 V dc. Operated by tram-style vehicles which work through on to the Innsbruck tram system at 750 V dc.  
*Montafonerbahn AG: Bludenz – Schruns (420). Electrified 15 kV 16.7 Hz [http://www.montafonerbahn.at www.montafonerbahn.at ]
 
*Raab-Oedenburg-Ebenfurter Eisenbahn AG: Ebenfurth – Sopron (512), Neusiedl am See – Fertószentmiklós (731). An international railway in joint Austrian and Hungarian ownership, better-known by its Hungarian name, Györ-Sopron Ebenfurti Vasút (GySEV). Raab and Oedenburg are the German names for Györ and Sopron respectively. The line from Ebenfurth to Sopron is electrified at 25 kV 50 Hz and used by dual-frequency ÖBB trains between Sopron and Wien Südbf. GySEV also owns the line between Sopron and Györ, which is entirely in Hungary and electrified at 25 kV 50 Hz. [http://www.raaberbahn.at www.raaberbahn.at]
*[https://westbahn.at Westbahn Management G.m.b.H]: Wien Westbahnhof Salzburg (100, 101). The first open access operator in Austria; runs an hourly semi-fast service between Wien and Salzburg.  
*Salzburg Stadtwerke AG Verkehrsbetriebe Lokalbahn: Salzburg Lokalbahn – Trimmelkam and Lamprechtshausen (210). Electrified 1000 V dc. Bürmoos – Trimmelkam was acquired from Stern und Hafferl by Salzburg Stadtwerke on 31 July 1993 and modernised, with construction of a new underground terminus outside Salzburg Hbf. [http://www.slb.at www.slb.at]
 
*Steiermärkische Landesbahnen: Gleisdorf – Weiz Stadt (531), Feldbach – Bad Gleichenberg (532) (electrified 1000 V dc), Peggau-*Deutschfelstritz – Ubelbach (540) (electrified 15 kV 16.7 Hz), Unzmarkt – Tamsweg (630) (760 mm gauge), Mixnitz – St Erhard (760 mm gauge, electrified 800 V dc, freight only but it is possible to charter passenger trains or passenger coaches on freight trains), Weiz – Anger (760 mm gauge, freight and limited steam tourist trains). [http://www.stlb.at www.stlb.at]
*[http://www.wlb.at Wiener Lokalbahnen AG]: Wien Oper – Baden Josefsplatz (515) Electrified, 800 V dc. A long-distance tramway ("inter-urban" in north American parlance), connected to the Wien tram system. Owned by Wiener Stadtwerke AG
*Stern und Hafferl: Linz Hbf – Peuerbach and Neumarkt-Kalham (143) (electrified 800 V dc, operated by dual-system EMUs into Linz Hbf on 15 kV 16.7 Hz), Lambach – Vorchdorf-Eggenberg (160), Vorchdorf-Eggenberg – Gmunden Seebf (161) (metre gauge, electrified 800 V dc), Vöcklamarkt Lokalbahn – Attersee (180) (metre gauge, electrified 800 V dc), Vorchdorf-Eggenberg – Brauerei Eggenberg (freight only).[http://www.stern-verkehr.at www.stern-verkehr.at]
*Stubaitalbahn AG: Innsbruck – Fulpmes (320). Metre gauge, electrified 900 V dc. Operated by tram-style vehicles which work through onto the Innsbruck tram system at 750 V dc. [http://www.ivb.at www.ivb.at]
*[http://www.zillertalbahn.at Zillertalbahn (Zillertaler Verkehrsbetriebe AG)]: Jenbach – Mayrhofen (310) (760 mm gauge)
*Südburgenländische Regionalbahn: Oberwart Oberschützen (leased to FROWOS: see Tourist Lines below); Oberwart – Großpetersdorf – Rechnitz (freight, plus July and August Sunday excursions from Grosspetersdorf "towards Märchenwald") [http://www.maerchenbahn.at www.maerchenbahn.at]
*Westbahn Management GmbH: The first open access operator in Austria, it runs an hourly fast service between Wien Westbahnhof and Freilassing. [https://westbahn.at www.westbahn.at]
*AG der Wiener Lokalbahnen: Wien Oper – Baden Josefsplatz (515) An 800 V dc long-distance tramway, connected to the Wien tram system. [http://www.wlb.at www.wlb.at]
*Zell am See – Krimml (230), Pinzgauerbahn, 760 mm gauge, operated by SLB. [http://www.pinzgauerlokalbahn.at www.pinzgauerlokalbahn.at]
*Zillertaler Verkehrsbetriebe AG: Jenbach – Mayrhofen (310) (760 mm gauge). [http://www.zillertalbahn.at www.zillertalbahn.at]


==Tourist Lines==
==Tourist Lines==
Various private lines, listed above, and the Schneebergbahn line are wholly or largely tourist operations.
Listing current at September 2016 with updates where known.


*Achenseebahn AG: Jenbach Achenseebf – Achensee Schiffstation (311). Metre gauge, rack operated. Steam worked. Does not operate during the winter. [http://www.achenseebahn.at www.achenseebahn.at]
Various lines listed under Other Railways, above, are wholly or largely tourist operations but are not repeated here. Some of the following lines are commercial operations but most are supported by preservation societies.
*Ampflwang – Timelkam [http://www.oegeg.at www.oegeg.at]
*Wälderbähnle (Bregenzerwaldbahn) (BWB): Bezau – Bersbuch (760 mm gauge)
*Eisenerz Schaubergwerk (900 mm gauge) [http://www.abenteuer-erzberg.at www.abenteuer-erzberg.at]
*Erzbergbahn: Vordernberg Markt – Eisenerz [http://www.erzbergbahn.at www.erzbergbahn.at]
*Festritztalbahn: Weiz – Birkfeld (760 mm gauge) [http://www.feistritztalbahn.at www.feistritztalbahn.at]
*Flascherlzug: Stainz – Preding-Wieselsdorf (760 mm gauge) [http://www.stainz.at/stainz/zug.htm www.stainz.at/stainz/zug.htm]
*Club Florianerbahn: St.Florian – Pichling See (900 mm gauge) (currently out of service) [http://www.florianerbahn.at www.florianerbahn.at]
*Gurkthalbahn: Treibach-Althofen – Pöckstein-Zwischenwässern (760 mm gauge) [http://www.gurkthalbahn.at www.gurkthalbahn.at]
*Höllentalbahn: Payerbach Ort – Hirschwang (760 mm gauge) [http://www.lokalbahnen.at/hoellentalbahn www.lokalbahnen.at/hoellentalbahn]
*Jochberg (Kitzbühl) Schaubergwerke Kupferplatte (600 mm gauge)
*Klagenfurt Museumstramway [http://www.nostalgiebahn.at www.nostalgiebahn.at]
*Lavamünder BahbetriebsgesmbH St.Paul – Lavamünd (trains can be chartered) [http://www.nostalgiebahn.at/lavantblitz.php www.nostalgiebahn.at/lavantblitz.php]
*Museumstramway Mariazell-Erlaufsee: Mariazell – Erlaufsee
*Martinsberger Lokalbahn: Martinsberg-Gutenbrunn – Zwettl [http://www.lokalbahnverein.at www.lokalbahnverein.at]
*Oberwart – Oberschützen [http://www.frowos.com/Sprachen/EN/EN.htm http://www.frowos.com/Sprachen/EN/EN.htm]
*Reißeckbahn (Tauern Touristik GmbH): Schoberboden – Reißeck (not included in the Fahrpläne Österreich). 600mm gauge [http://www.tauerntouristik.at/en/reisseck/index.php www.tauerntouristik.at/en/reisseck/index.php]
*Rosenthaler Dampfbummelzüge: Weizelsdorf – Ferlach [http://www.nostalgiebahn.at www.nostalgiebahn.at]
*St Wolfgang Schafbergbahn – Schafbergspitze (173), metre gauge, rack operated, steam and diesel, is now trading as Salzkammergutbahn GmbH , under the Salzburg AG umbrella. [http://www.schafbergbahn.at www.schafbergbahn.at]
*Steyrtalbahn: Grünburg – Steyr Lokalbf (760 mm gauge) [http://www.steyrtalbahn.at www.steyrtalbahn.a]t
*Taurachbahn: Mautendorf – St Andrä (760 mm gauge) [http://www.club760.at www.club760.at]
*Ybbsthalbahn Bergstrecke: Kienberg-Gaming – Lunz am See (760 mm gauge) [http://www.lokalbahnen.at/bergstrecke www.lokalbahnen.at/bergstrecke]
ÖBB has a unit called ÖBB Erlebnisbahn (ÖBB Experience Railway). See [http://www.erlebnis-bahn-schiff.at www.erlebnis-bahn-schiff.at] for more information. ÖBB Erlebnisbahn currently operate summer weekend services on the Korneuburg to Ernstbrunn branch as detailed in table 931.


NOVÖG operate tourist services on the following lines:
<!---
*801 Gmünd NÖ Gross Gerungs (760 mm gauge)  
An English language site lists tourist lines.  [http://sinfin.net/railways/world/austria.html Railways of the World - Austria]. See under "Tourist and Museum Lines" section heading.
*802 Gmünd NÖ Litschau and Heidenreichstein (760 mm gauge)
GLYN WILLIAMS' LIST IS NOT FULLY UP TO DATE - RETAIN THIS NOTE TO DOUBLE CHECK AGAINST HIS LIST OCCASIONALLY. Kupferschaubergwerk Radmer - AT 350MM - HAS BEEN DELIBERATELY IGNORED, AS HAVE FUNICULARS (Reisseck is included below because of its narrow gauge rail element)
*811 Krems a d Donau - Emmersdorf a d Donau
--->
*941 Retz - Drosendorf
*[http://www.abenteuer-erzberg.at/en/abenteuer-erzberg/historic-underground-mine-tour Abenteuer Erzberg] (900 mm gauge, underground mine railway) (note: can be reached by Erzbergbahn)
*[http://www.achenseebahn.at Achenseebahn AG]: Jenbach Achenseebf – Achensee Schiffstation (metre gauge, rack operated). This line is potentially in danger of closure at the end of the 2019 season owing to poor track condition.
*[http://www.erzbergbahn.at Erzbergbahn] (Verein Erzbergbahn): Vordernberg Markt – Erzberg (Erzberg - Eisenerz out of service since 2016 because of storm damage)
*[http://www.feistritztalbahn.at Feistritztalbahn] (Feistritztalbahn Betriebsges.m.b.H.) : Birkfeld – Anger – Weiz (760 mm gauge)  <i>Operated in conjunction with [http://club-u44.at Club U44]</i>. See also Recent Changes, below.
*[http://www.florianerbahn.at Club Florianerbahn]: St.Florian – Pichling See (900 mm gauge) (at September 2016 had been out of service for several years but still aspire to reopen the line) 
*[http://www.gurkthalbahn.at Gurkthalbahn]: Treibach-Althofen Pöckstein-Zwischenwässern (760 mm gauge)  
*[http://www.lokalbahnen.at/hoellentalbahn/timetable-e.html Höllentalbahn] (Österreichische Gesellschaft für Lokalbahnen): Payerbach Ort Hirschwang (760 mm gauge
*[http://www.nostalgiebahn.at/lendcanaltramway.html Klagenfurt museum tramway (Lendcanaltramway Klagenfurt)] (Nostalgiebahnen in Kärnten): (metre gauge)
*[http://www.liliputbahn.com/liliput.htm Liliput-Bahn] (Liliputbahn Prater G.m.b.H.): Wien's historic 15 inch gauge line - ca. 3.9km circuit in Prater park. Also operate separate [http://www.liliputbahn.com/donaupark.htm Donaupark] line.
*[http://www.oegeg.at/normalspur/museumsbahn/ Museumsbahn Ampflwang-Timelkam] (Österreichischen Gesellschaft für Eisenbahngeschichte (ÖGEG)): Ampflwang – Timelkam
*[http://www.lokalbahnverein.at/englisch/index_e.php Museums-Lokalbahnverein Zwettl]: Zwettl – Schwarzenau
*[http://www.museumstramway.at Museumstramway Mariazell-Erlaufsee]: Mariazell – Erlaufsee
*[http://www.pferdeeisenbahn.at/index.php?page=zeit-preise-kontakt Pferde-Eisenbahn] (Pferdeeisenbahn Museum & Gaststätte, Rainbach i.M.): (1106mm gauge; short horse-drawn tramway)
<!---*Oberwart – Oberschützen (operation by Freunde der Bahnstrecke Oberwart-Oberschützen (FROWOS) ceased after 2011 season - see [http://kurier.at/chronik/burgenland/museumsbahn-verein-in-den-letzten-zuegen/786.018 press report])--->
*[http://regiobahn.at/event/nostalgieexpress-leiser-berge/ Regiobahn]: [Wien Praterstern - ] Korneuburg – Ernstbrunn
*[http://www.reisseck-gemeinde.at/node/220 Reißeckbahn]: Schoberboden – Reißeck (600mm gauge in conjunction with funicular) (formerly operated by Verbund AG - service suspended from 2016 - see Recent changes)
*[https://www.rheinschauen.at/museum-baehnle/rheinbaehnle Rheinbähnle] (Rhein-Schauen Museum und Rheinbähnle): Rheinmündung - Lustenau - Steinbruch (750mm gauge, 750V d/c) (see [https://www.rheinschauen.at/images/Streckenplan.jpg route map] - former maintenance railway of Internationale Rheinregulierung)
*[http://www.nostalgiebahn.at/rosentaler-dampfzuege.html Rosenthaler Dampfzüge] (Nostalgiebahnen in Kärnten): Weizelsdorf – Ferlach
*[http://kupferplatte.at/en/ Schaubergwerke Kupferplatte]: Jochberg, Kitzbühl (600 mm gauge, underground mine railway)
*[http://www.silberbergwerk.at/en/tour/ Schwazer Silberbergwerk] (Schwazer Silberbergwerk Bsucherführung G.m.b.H.): Schwaz/Tirol (narrow gauge, underground mine railway - <i>Die Grubenbahn</i>)
*[http://www.stainz.at/tourismus-und-freizeit/flascherlzug/ Stainzer Flascherlzug]: Stainz – Preding-Wieselsdorf (760 mm gauge)
*[http://www.steyrtalbahn.at Steyrtalbahn] (Österreichischen Gesellschaft für Eisenbahngeschichte (ÖGEG)): Grünburg – Steyr Lokalbf (760 mm gauge)
*[http://www.club760.at/html/fahrplanE.htm Taurachbahn] (Club 760): Mautendorf – St Andrä (760 mm gauge)
*[http://www.waelderbaehnle.at/ Wälderbähnle] (Bregenzerwaldbahn-Museumsbahn Betriebsges.m.b.H): Bezau – Bersbuch (760 mm gauge)
*[http://www.club760.at/html/fahrplanE.htm Ybbsthalbahn Bergstrecke] (Niederösterreichische Lokalbahnen Betriebsges.m.b.H. (NÖLB)): Kienberg-Gaming – Lunz am See - Göstling an der Ybbs (760 mm gauge)
*[http://www.landesbahn.at/ Zayataler Schienentaxi] (Verein Neue Landesbahn): Mistelbach Interspar - Asparn an der Zaya (connects with Weinvierteldraisine - see below)


Rail cycling is possible on a number of lines; see the [http://www.draisinenfahrten.de/index.html IG Draisinenfahrten website]. Click on 'International', followed by 'Draisinenlinks' to obtain website details under the heading 'Draisinenstrecken in Österreich (AT)'.
Rail cycling is possible on a number of lines:
 
*[http://www.carnuntumdraisine.at Carnuntum-Draisine]: Bruck an der Leitha Ost - Petronell-Carnuntum. Operations ceased in early 2019.
*[http://www.mostviertler-schienenradl.at Mostviertler Schienenradl]: Ruprechtshofen - Wieselburg an der Erlauf (760 mm) Operations ended in Autumn 2018 as they plan to relocate to Lunz am See on the [http://www.club760.at/html/fahrplanE.htm Ybbsthalbahn Bergstrecke] and run to Stiegengraben, probably commencing in 2020. 
*[http://www.draisinentour.at Sonnenland Draisinentour]: Horitschon/Neckenmarkt - Oberpullendorf
*[http://www.weinvierteldraisine.at Weinvierteldraisine]: Ernstbrunn - Asparn an der Zaya  (connects with Zayataler Schienentaxi - see above)


==Metro==
==Metro==
Wien has a third rail U-Bahn (much of which is above ground) and several sections of overhead-electrified U-Bahn tramway with metro characteristics.
Wien has a third rail U-Bahn (much of which is above ground) and several sections of overhead-electrified U-Bahn tramway with metro characteristics. A track plan is available on the [http://www.gleisplanweb.eu/Map.php?Map=Wien Gleisplanweb site].


==Trams==
==Trams==
[http://www.stern-verkehr.at Gmunden], [http://www.gstw.at Graz], [http://www.ivb.at Innsbruck],  [http://www.linzag.at Linz], [http://www.wienerlinen.at Wien] (which extends via the Wiener Lokalbahnen into Baden). The Wien system is the largest European network outside Russia.
[http://www.stern-verkehr.at Gmunden], [http://www.gstw.at Graz], [http://www.ivb.at Innsbruck],  [http://www.linzag.at Linz], [http://www.wienerlinen.at Wien] (which extends via the Wiener Lokalbahnen into Baden). The Wien system is the largest European network outside Russia.
Track plans for the systems of Graz, Linz, Innsbruck and Wien are available on the [http://www.gleisplanweb.eu/ Gleisplanweb site], and most were current at 2018 [Linz 2016]. 
See also [[Austria_-_Tram_services_over_obscure_routes|Austria - Tram services over obscure routes]]


==Recent and future changes==
==Recent and future changes==


===Projects under way or planned===
===Projects under way or planned===
A letter of intent was signed in March 2019 by the Ministry of Transport to extend the Salzburger Lokalbahn into the city centre.
ÖBB-Infrastruktur will electrify the last remaining section of unelectrified track in Tirol by the end of 2019 at 15 kV 16·7 Hz. This is the 14·4 km of line between Reutte and Schönbichl at the German border. This will include two blockades of the route; from 16 March to 26 April 2019 and from 14 September to 9 November 2019.
Electrification of the Gailtalbahn (Arnoldstein - Hermagor) commenced in July 2018 with a planned completion for December 2019; Hermagor – Kötschach-Mauthen closed to passengers in December 2016. A lengthy closure with bus substitution will take place from 9 July to 14 December 2019, further to a closure in late 2018. The Kärnten Land government envisages that all remaining lines in Kärnten will be electrified by 2025.
Wien ''U-Bahn'' Line U4 is to be closed between Längenfeldgasse and Karlsplatz in July and August 2019 for modernisation.  Preliminary work has started on rerouting line U2 and transferring part to a new line U5 - see [http://www.wienerlinien.at/media/img/2016/image_178729_w800.jpg plan here] - with target date for implementation of 2023.
[http://regiobahn.at/zukunftsprojekt Regiobahn] have aspirations to restore regular all-year service to the Korneuburg – Ernstbrunn branch.
Electrification of Klagenfurt – Weizelsdorf was agreed in early 2016 by ÖBB and Kärnten Land, although it is not known when this is to be completed. Weizelsdorf – Rosenbach closed to passengers in December 2016.


The terminal station of the metre gauge branch from Vorchdorf, Gmunden Seebahnhof, is to close. A new section of line from Gmunden Traundorf to Klosterplatz will be constructed and this is intended to be the first stage in connecting the branch to the Gmunden town tram line.  
Electrification of Gänserndorf - Marchegg is part of an upgrade of the Wien - Bernhardstal - [Breclav] line to be completed by 2026.


Construction of a new chord giving direct access from Wien Hauptbahnhof to Wien Airport has started. The 2.1 km chord, which leaves the Hegyeshalom line 2 km north of Kledering, and joins the Rennweg – Schwechat line 2 km west of Kaiserebersdorf, is due to be completed by the end of 2014.
The plan to convert part of the Murtalbahn (Unzmarkt - Tamsweg) to standard gauge and electrify it has been abandoned. However the line will be reconstructed, with four realignments. Unzmarkt - Murau will be done in 2019 - 2022 and Murau - Tamsweg in 2022 - 2026.


Göstling to Lunz am See, the final section of the closed Ybbstalbahn line from Gstadt, is due to reopen as a museum line in July 2013.
Information (in German) about ÖBB's major infrastructure projects an be found at their [https://infrastruktur.oebb.at/de/projekte-fuer-oesterreich/bahnstrecken website]. The major project to improve service between Wien, Graz, Klagenfurth, Villach and Tarvisio [IT], the [http://www.infra.oebb.at/suedstrecke <i>Südstrecke</i> project], is due for completion in 2026. As part of this project, work continues on the <i>Koralmbahn</i> element, to link Klagenfurt and Graz: the 32 km Koralmtunnel is its centrepiece and target completion date for this section is 2023. The first section between Werndorf and Wettmannstätten (table 550) opened on 12 December 2010.  


In late 2011 OBB presented their plans for the period to 2025. Upgrades include a link to Wien Airport and the St Polten freight by-pass to complete Wien – Wels quadrupling. OBB want to give up 700 km of branch lines either by handing to regional authorities or complete closure. The passenger lines selected, based on a minimum threshold of 2000 passengers per day, were:
ÖBB plans to electrify and resignal the section of the ''Lavanttalbahn'' (KBS620) from the future junction with the ''Koralmbahn'' just north of St Paul as far as Wolfsberg. This will allow fast services to run between Klagenfurt and Wolfsberg via the ''Koralmbahn''.


*171 Attnang-Puchheim – Reid/Innkreis – Schärding*
It is reportedly planned to double sections of the <i>Steirische Ostbahn</i> (Graz – Gleisdorf – Szentgottard [HU]),  but  information on this is sparse: [http://de.wikipedia.org/wiki/Steirische_Ostbahn Wikipedia's Steirische_Ostbahn entry] indicates a south to east Graz avoiding line (otherwise any trains between the Koralmbahn and Szentgottard would have to run round in Graz) but states that the start of the project has been delayed due to its relatively low priority in the general transport plan. The project does not appear in [https://infrastruktur.oebb.at/de/projekte-fuer-oesterreich/bahnstrecken OeBB Infra's list of projects].
*153 Wels – Grünau*
 
*142 Rottenegg – Aigen–Schlägl
====Threatened passenger lines====
*133 Sarmingstein – St Nikola
The following lines are planned to close at the end of 2019:
*524 Deutschkreutz Neckenmarkt
*132 Waidhofen an der Ybbs Vogelsang - Gstadt (a further cutback of the rump of the narrow-gauge ''Ybbstalbahn'')
*660 Viktring – Rosenbach
*133 Sarmingstein – St Nikola (service very limited)
*670 Hermagor – Kötschach-Mauthen
*152 Haiding Aschach an der Donau (service very limited). The ''Linzer Lokalbahn ("LiLo")'' '''should''' be taking over the Eferding - Aschach section 'in the future'. This would presumably mean an improved service over this part of the line.
*522 Bad Fischau – Puchberg
*912 Groß Schweinbarth – Bad Pirawarth (runs Mondays to Fridays only)
*521 Pernitz-Muggendorf – Gutenstein
*912 Obersdorf - Groß Schweinbarth - Gänserndorf
*912 Gänserndorf – Gross Schweinbarth – Bad Pirawarth
 
*912 Obersdorf - Gross Schweinbarth
*311 Jenbach - Achensee. The ''Achenseebahn'' is potentially in danger of closure at the end of the 2019 tourist season owing to poor track condition. As it is a tourist line, the Tirol region does not wish to subsidise it. However, if it had a daily passenger service, the region would be required by law to do so. The closure threat is no doubt the first stage in an attempt to gain funding for renovation.
*820 Hadersdorf – Sigmundsherberg
*560 Spielfeld-Strass – Bad Radkersburg
*Bleiburg – Prevalje


Some of these lines were already under serious threat. The lines marked * may be privatized as part of an agreement with the regional government of Oberösterreich, along with Haiding to Aschach. Although the line from Rottenegg to Aigen-Schlägl, part of the branch from Linz Urfahr, is on the above list, the Linz Urfahr to Rohrbach section is planned for conversion into tram-train operation, with the rest of the line being shut. At Rohrbach a new line, 2.8 km long, will be built towards the town centre, and at Linz a new line will be built from Urfahr to Hauptbahnhof.
The following lines will continue until 2029:
*142 Linz Urfahr - Rottenegg – Aigen–Schlägl. The section between Linz Urfahr and Rohrbach was planned for conversion into tram-train operation, with the rest of the line being shut. If train-tram went ahead, at Rohrbach a new line, 2.8 km long, would be built towards the town centre, and at Linz a new line from Urfahr to Hauptbahnhof but the Oberösterreich Land Parliament wishes to keep the existing railway and reconnect it with the main rail network. Current plans suggest that a heavy-rail S-Bahn line may be built to connect Linz Hbf with Linz Urfahr, but completion is not expected until at least 2025.
*153 Wels - Grünau im Almtal
*171 Attnang-Puchheim – Reid/Innkreis – Schärding


===Recent changes===
*(620)  Bleiburg – Holmec (Slovenia) - Prevalje has been threatened with closure in the past, but will gain a two-hourly service on Mondays to Saturdays in December 2019 under the designation ''S11''.


The Deutschkreutz to Oberloisdorf line, which had a limited passenger service as far as Neckenmarkt-Horitschon, was expected to close in December 2012. In the event the passenger service was reprieved at a late stage, but has since ceased, with final trains running on 28 June 2013.  
In late 2011 OeBB presented their plans for the period to 2025, which included a wish to give up some 700 km of branch lines - either by handing to regional authorities or complete closure. Based on failing to reach a minimum threshold of 2000 passengers per day, the passenger lines identified (other than those already listed above or already closed) are listed below. A note is given of any overt action towards closure that has been reported subsequently.


Wien Hauptbahnhof (the replacement for Südbahnhof) was partially opened on 9 December 2012. In connection with this, two U Bahn stations were renamed; Wien Südbahnhof became Quartier Belvedere, and Südtirolerplatz became Wien Hauptbahnhof. At the same time the metro station Südtirolerplatz became Südtirolerplatz- Hauptbahnhof. On this date the temporary station at Südbahnhof (Ost) closed.
*502    Spielfeld-Strass – Bad Radkersburg
*521 Pernitz-Muggendorf – Gutenstein
*522 Bad Fischau – Puchberg
*820 Hadersdorf – Sigmundsherberg


The Wien Haidersdorf to Wien Meidling  section of the Westbahn high speed line opened to freight in late 2012, but is not due to be used by passenger services until after Hauptbahnhof opens fully in December 2014.
While not in the above official listing, the following routes have appeared on various closure "threat lists" over the years and may be considered at some risk:


The Wörgl Baumkirchen tunnel line opened in December 2012, although signalling issues meant that, initially, it was only used by Railjet services.   
*170  Bad Aussee Stainach-Irdning
*172  Vöcklabruck – Kammer-Schörfling
*720  [Wien Hbf -] Kledering - Sollenau (Mondays to Fridays only, with very poor loadings)


In September 2012 a 4km section of new alignment opened between Lambach and Breitenschützing as part of line improvements on the Wels – Salzburg route.  
<i>Innsbrucker Mittelgebirgsbahn</i>, the light rail line to Igls operated as route 6 of the Innsbruck tram system, has in the past been threatened with closure but will now be operated as a Museum Tramway.


In May 2012 the SLB branch terminus at Lamprechthausen was relocated closer to the town centre by extending the line by 300 metres.
===Recent changes===


In September 2011 a new alignment opened on the Lieboch to Köflach branch, between Krottendorf and Söding.
The ''Aspangbahn'' has been realigned for a distance of around 1km between Laxenburg-Biedermannsdorf and Maria Lanzendorf where it crosses the ''Pottendorfer Linie'' (Inzersdorf - Ebenfurth) on a new bridge, 200m north of the previous one.


An 800 metre new alignment on the Zell am See to Krimml branch, between Uttendorf-Stubachtal and Pirtendorf, opened in November, avoiding tight curves and numerous level crossings.  
A further extension of the ''S31'' (Gleisdorf - Weiz) from Weiz Zentrum to Weiz Nord was opened to passengers on 10 September 2018. The section from Weiz Bahnhof to Weiz Zentrum opened on 4 June 2016 when the line to the original terminus at Weiz (formerly Weiz Stadt) was closed.


On 2 October 2011 Wien metro line U2 was extended from Stadion to Aspernstrasse.
The Weiz - Oberfeistritz (Steiermärkische Landesbahnen) line has been temporarily cut back to Krottendorfer Hauptstraße (about 1km from Weiz) until the end of 2020, to allow construction of a new bypass road. When the line is reinstated to Weiz, the Feistritztalbahn station will be on the east side of Weiz Bahnhof, rather than in the forecourt on the west side, as previously.  


The line from Friedberg to Oberwart (table 520) lost its passenger service with effect from 1 August 2011. On the same date the service between Deutschkreutz and Neckenmarkt-Horitschon was reduced to three rush-hour services each way, and an hourly M-S service was introduced between Klagenfurt and Weizelsdorf (table 660), the remainder of this line only seeing a single early morning train from Rosenbach.  
Prior to this, the line was temporarily closed following the last train on 24 December 2014 owing to the poor condition of the Bachl viaduct and the Hardt-Puch tunnel. The Oberfeistritz - Birkfeld section was leased to Club U44, which moved all its rolling stock to the then cut off Birkfeld. However patronage fell considerably in 2015 so the Steiermark Region sold the entire line to the Feistritztalbahn Betriebsges.m.b.H. in February 2016 for a nominal €1 and contributed €235,000 for repairs. The line reopened for seasonal passenger service throughout between Birkfeld and Weiz in April 2016 (see Tourist Lines).


Work continues on the Koralmbahn Klagenfurt – Graz , with the 32 km Koralmtunnel as its centrepiece. The first section between Werndorf and Wettmannstätten opened with effect from 12 December 2010, and the entire single track line is due to be completed by 2023. There is more information at [http://de.wikipedia.org/wiki/Koralmbahn de.wikipedia.org/wiki/Koralmbahn] (but be careful – Wikipedia information may always be biased). It is planned also to build partial double tracks on the Steirische Ostbahn (Graz – Gleisdorf – Szentgottard (Hungary), but the information on this is very sparse. [http://de.wikipedia.org/wiki/Steirische_Ostbahn de.wikipedia.org/wiki/Steirische_Ostbahn] indicates a south to east Graz avoiding line (otherwise all trains Koralmbahn – Szentgottard would have to run round in Graz) and a possible completion in 2020. But without these measures to the Steirische Ostbahn, the investment in Koralmbahn would be of much less value – it would not be practical to route more freight through Hungary, where there are considerably less gradients than the Semmering route.
The residual passenger service, mainly for school traffic, between Wolfsberg and Bad St. Leonhard (KBS620) was definitively withdrawn on 10 December 2017. It had been operated by replacement bus since 5 March 2017. The line remains in use for freight.


The following lines closed at the timetable change on 11 December 2010:
The 24.7km St Pölten avoiding line opened on 10 December 2017. Although primarily for freight, it is used occasionally by relief passenger trains; see [[Austria - Lines with Obscure or Sparse passenger services#WAG_ROR|AT19/21]]


*113 Schrambach - Markt St.- Aegyd am Neuwalde
The 4.6km southern extension of Wien ''U-Bahn'' line U1 from Reumannplatz to Oberlaa opened on 2 September 2017; from the same date, tram 67 ceased to run south of Reumannplatz.
*115 Ober Grafendorf - Mank 
*120 Scheibbs - Kienberg-Gaming
*132 Gstadt - Lunz am See and Gstadt - Ybbsitz. These lines had already been closed since mid 2009 owing to floods. The section from Waidhofen to Gstadt has remained open, operated by NOVÖG.
*811 Krems an der Donau - Emmersdorf an der Donau. This has reopened for tourist services operated by NOVÖG.
*830 Schwarzenau - Zwettl Stadt
*831 Schwarzenau - Waidhofen an der Thaya
*912 Groß Schweinbarth - Sulz Museumsdorf
The StH line (Lambach -) Neukirchen – Haag lost its passenger service from 13 December 2009. It had been said that there was no financially viable way to connect this line when the Westbahn is upgraded Linz – Salzburg. On the same date a new alignment opened between Atzenbrugg and a point two kilometers east of the proposed new Tullnerfeld station, on the Herzogenburg to Tulln line. The intermediate stations of Michelhausen and Judenau have been closed. The new line runs alongside the high speed Wien to St Pölten line currently under construction. The old alignment has been de-electrified but, other than a short section at the east end, is still in use for freight. In connection with this, two freight-only spurs, a 1.8 km west to north chord at Tulln and a 0.9 km south to east chord at Absdorf-Hippersdorf, have been opened.  


The new entrance to St Pölten from the east (Knoten Wagram) was completed in August 2005. This includes preparation for the tracks from the New Westbahn (Wienerwald Tunnel – Tullnerfeld).
Reißeckbahn, a funicular and narrow gauge railway from Kolbnitz, was initially to be closed for summer 2016 season to enable engineering work on local hydro power plant, but it now seems possible the line will not reopen. The nearby Kreuzeckbahn may be under some threat, too. See  [http://www.kleinezeitung.at/kaernten/oberkaernten/peak_oberkaernten/4822185/Reisseck_2016_Kein-Sommerbetrieb-der-Reisseckbahn 2015 press report] and [http://www.kleinezeitung.at/kaernten/oberkaernten/5020340/Reisseck-Muhldorf_Reisseckbahn-und-Kreuzeckbahn-stehen-vor-dem-Aus later 2016 press report] (both in German)


Electrification between Mistelbach and Laa an der Thaya was completed for use in December 2006. Graz Don Bosco station opened 7 September 2007. 
Because of storm damage, the Erzbergbahn has operated only between Vordernberg Markt and Erzberg (thence to Eisenerz out of service) since 2016.  


Work started in 2007 to build a new Wien Hauptbahnhof on the site occupied by Südbahnhof until 12 December 2009. From this date services to Bruck a d L, and Stadlau and beyond, used a temporary station Wien Südbahnhof (Ost), 150 m to the south of the old station site, and services to Wiener Neustadt and beyond ran from Wien Meidling. The S-bahn platforms (21 and 22) in the basement have temporary entrances outside the construction area. All long-distance trains from Westbahn will, when all construction is complete, use the Lainzer tunnel and Hauptbahnhof instead of Westbahnhof. A new motive power and carriage depot has been built on what has been freight yard and sidings at Matzleinsdorfer Platz between Wien Süd and Meidling. For more information see this page which contains several links: [http://www.hauptbahnhof-wien.at www.hauptbahnhof-wien.at]. Passenger information in German: [http://www.hauptbahnhof-wien.at/de/Presse/Publikationen/Folder/HBFW_Fahrgastbroschuere.pdf www.hauptbahnhof-wien.at/de/Presse/Publikationen/Folder/HBFW_Fahrgastbroschuere.pdf]. General information in English : [http://www.hauptbahnhof-wien.at/de/Presse/Publikationen/Folder/VIENNA_CENTRAL_STATION_Imagefolder_engl.pdf www.hauptbahnhof-wien.at/de/Presse/Publikationen/Folder/VIENNA_CENTRAL_STATION_Imagefolder_engl.pdf].
Operation by Lavamünder Bahn- und Betriebs GesmbH (LBB) on the closed line between St.Paul and Lavamünd ceased in 2015 - see [http://www.kleinezeitung.at/kaernten/lavanttal/peak_lavanttal/4940909/Bahnstrecke_Das-Ende-der-Lavamunder-Bahn press report] (in German).


For more information and links on these and other projects, see (in German) [http://www.oebb.at/vip8/bau/de/Projekte_Planung_und_Bau/index.jsp www.oebb.at/vip8/bau/de/Projekte_Planung_und_Bau/index.jsp].
A 2.8 km extension of the <i>Salzburger Lokalbahn</i> (SLB) from Trimmelkam to Ostermeithing was inaugurated on 12 December 2014.  


Other new lines opened recently are:
Wien Hauptbahnhof was officially opened on 10 October 2014 (although work continued until opening of all facilities - with through services, use of newly built flyovers at the west end and diveunders at the east end - could take place). All long-distance trains from the Westbahn - which formerly used Wien Westbahnhof - now use the Lainzer tunnel and Hauptbahnhof - the replacement for Südbahnhof. The new station had been partially opened on 9 December 2012, in connection with which two U Bahn stations were renamed; Wien Südbahnhof became Quartier Belvedere, and Südtirolerplatz became Wien Hauptbahnhof. At the same time the metro station Südtirolerplatz became Südtirolerplatz-Hauptbahnhof. A new motive power and carriage depot has been built on what has been freight yard and sidings at Matzleinsdorfer Platz between Wien Süd and Meidling.


* Innsbruck avoiding line, linking the Brenner and Wörgl lines (this is used only by freight trains)
In December 2014 a flyover was opened across Kledering Yard (Wien Zvbf) to connect the Wien – Hegyeshalom line with Kaiserebersdorf. This provides a direct route between the new Hauptbahnhof and Flughafen Wien (VIE) (the airport), used twice hourly by <i>railjet</i> and Intercity services, as an alternative to the <i>City Airport Train</i> and S7 route to Wien Mitte.  
* Tunnel for fast trains between Leoben Hbf and St Michael
* Diversion of the Tauernbahn, mostly in tunnels, between Lindisch and Mallnitz
* The double track Schlierbach Umfahrung (bypass) on the Linz – Selztal line
* Double tracking of Kolbnitz – Pusarnitz on the Tauernbahn
* Double tracking Meidling – Inzersdorf
Preliminary work on a Semmering base tunnel has resumed and the principal route decided.


ÖBB is withdrawing freight services from many lines, including the entire narrow-gauge network. It has also stated that in order to cope with reduced subsidies, many passenger services will also have to be withdrawn. Campaigning groups have listed almost every non-electrified line as under threat.
The Wien Hadersdorf - Meidling – Wien Hütteldorf section of the ''Neue Westbahn'' opened to freight in late 2012 and to passenger services to Wien Hauptbahnhof in December 2014.


The following routes have appeared on various recent closure threat lists so must be at risk; those marked # are already mostly served by buses. In many cases private operation is being sought to avoid closure.
The limited passenger services to/from Wien Westbahnhof to Tulln and beyond via the Tullnerfeld avoiding curve off the ''Neue Westbahn'' were rerouted to/from Tulln to terminate at Tullnerfeld station at the December 2014 timetable change.


* 115: St. Pölten – Ober Grafendorf – Mariazell
In early 2014 the metre gauge branch from Vorchdorf-Eggenberg was slightly shortened when its terminal station, Gmunden Seebahnhof, was relocated inland to a new site between Gmunden Traundorf and the old Seebahnhof. Construction started in March 2014 of a new connecting line from this new station to Rathausplatz. The initial section from Seebahnhof to Klosterplatz opened on 14 December 2014. The closed section of the Gmunden town tram line from Rathausplatz to Franz Josef Platz was rebuilt, providing a through route between Gmunden Bahnhof and Vorchdorf-Eggenberg, and opened on 1 September 2018. A [http://tinyurl.com/ppcoq39 sketch map] is available.
* 132: Waidhofen an der Ybbs – Gstadt
* 152: # Haiding – Aschach a d Donau
* 170: Bad Aussee – Stainach-Irdning
* 172: # Vöcklabruck – Kammer-Schörfling
* 410: (Garmisch-Partenkirchen) Ehrwald Zugspitzbahn – Schönbichl (Pfronten-Steinach)
* 620: # Zeltweg – Bad St. Leonhard, apparently closing on 31 July 2010
* 650: Villach – Feldkirchen – St Veit a d Glan
* 670: Arnoldstein – Kötschach-Mauthen
* 680: # Weizelsdorf – Rosenbach


Salzburger Lokalbahn has taken over the operation of the Zell am See – Krimml line on 1 July 2008.
The seasonal service on the Korneuburg – Ernstbrunn branch ceased in 2014 but had resumed by 2016 with a changed operator [http://www.regiobahn.at/event/nostalgieexpress-leiser-berge Regiobahn]. Regiobahn have aspirations to restore regular all-year service to the line.  


The Schneebergbahn, ÖBB's mountain rack railway, has been transferred to a company in which ÖBB and the local Province have an equal shareholding. ÖBB, in effect, continues to run the line, though it comes outside the standard fare system, and the operating loss is shared with the Provincial councils.
The Kammer-Schoerfling branch was cut back by around 500m in June 2014, thus eliminating 2 level crossings. A new terminal station was opened on the west side of the current line at a slightly lower level, involving around 200m of new alignment.


The Schafbergbahn was transferred to Salzburg AG in April 2006, see above.
The Wien Liesing – Waldmühle branch, which had no booked traffic other than excursions operated by [https://www.kaltenleutgebnerbahn.at/clubdesk/www Verein Pro Kaltenleutgebnerbahn], was legally closed in January 2014 but the preservation organisation have resumed services, including some through trips to and from central Wien, since 3 September 2017.


The light rail line to Igls, operated as an extension of the Innsbruck tram system, has been threatened with closure, but still continues to operate.
===Older Changes===
For details of older changes dating back to the year 2005 see [[Austria - Older General Information]].


==Special notes==
==Special notes==
ÖBB promotes a large number of rail excursions, some of which use freight only lines or visit places of railway interest. A brochure "Erlebnis Bahn & Schiff" is published annually and can be obtained at stations or from Verein Erlebnis Bahn & Schiff, Bahngasse 2, A-2721 Bad Fischau-Brunn, Austria, or from Austria Tourist Offices abroad. Excursions can be booked at principal ÖBB stations or through ÖBB Bahn-Totalservice, Wien Westbahnhof. Phone 01-5800-1700. Details can also be found at [http://www.erlebnis-bahn-schiff.at www.erlebnis-bahn-schiff.at] which includes an e-mail booking facility.


Explanations in English of Austrian (and German) railway signalling can be found at [http://mysite.du.edu/~jcalvert/railway/germaust.htm mysite.du.edu/~jcalvert/railway/germaust.htm].
Explanations in English of Austrian (and German) railway signalling can be found [http://mysite.du.edu/~jcalvert/railway/germaust.htm here].
 
Tourist railways up mountains are often of limited capacity, but subject to high demand, particularly at holiday periods and during the winter sports season. In such cases it may be necessary to wait some time before being able to board a train, so it is best to arrive at the railway as early in the day as possible.  When booking a trip it is often necessary to reserve a seat on a specific train down the mountain. Once the railway’s capacity to bring people back down the mountain is fully booked, no more can ascend, unless they are staying at a summit hotel.


==See also==
==See also==
{{Navbox Austria}}
{{Navbox Austria}}

Revision as of 12:29, 30 July 2019

Country Name

Austria (Österreich)

National Railway System

National Railway Operator

Österreichische Bundesbahnen (ÖBB).

Language

German, which differs in certain respects from the version spoken in Germany.

Currency

Euro

UIC code

numeric 81; alpha A.

Timetable

Journey Planner

ÖBB 'Scotty' Journey Planner

Downloadable Timetable

Individual tables can be downloaded here (table numbers can be found from this route plan). An offline journey planner can also be downloaded here.

Printed Timetable

ÖBB no longer publish a complete printed timetable, but do issue timetable booklets for each route (usually available only in the area in question). Table numbers can be found from this route plan.

Engineering Information

This page provides a pictorial map giving the location and type of engineering work and other incidents for ÖBB, and also significant events on neighbouring railway administrations.

A map of the network showing the locations and dates of engineering works in 2016, by quarter, is present here.

A map of the network showing the locations and dates of engineering works in 2017, by quarter, is present here.

The summer provides opportunity for engineering work which can result in sections of line being closed, with and buses substituted, for many weeks: it pays to check carefully.

Bus Information

The ÖBB 'Scotty' Journey Planner can be used to plan bus journeys. ÖBB Postbus timetables can be downloaded from the Postbus website.

Maps

Printed Maps

  • Eisenbahnatlas Österreich”, the second edition of which (ISBN 3-89494-138-3) was published in 2010 by Verlag Schweers + Wall GmbH, similar to atlases from the same publisher for Germany, Italy & Slovenia, and Switzerland.
  • European Railway Atlas: Denmark, Germany, Austria, Switzerland by M.G. Ball (1993) (ISBN 0-7110-2116-3)
  • European Railway Atlas by M.G. Ball (2008 onwards)

Web-based Maps

Infrastructure

Infrastructure Authority

Infrastructure is owned and managed by a public authority, ÖBB-Infrastruktur AG.

Network Statement

The Network Statement page gives access to the latest network statements.

Gauge

ÖBB is entirely standard gauge. Various Other Railways are narrow gauge, as noted below.

Electrification

15 kV 16.7 Hz. The electrification systems used by Other Railways are noted below. The following cross-border routes with Hungary are electrified at the Hungarian standard 25 kV 50 Hz:

  • between Ebenfurth and Deutschkreutz via Sopron (Ebenfurth station area can be switched between the two voltages);
  • between Neusiedl am See (exclusive) and Fertöszentmiklós (the electrification boundary is a few hundred metres south of Neusiedl station).

Rule of the road

Many lines are single track and most double track railways are signalled for reversible working. Most double track lines in Austria operate with right-hand running, although many lines in the east of the country once operated with left-hand running, a hangover from the days of the Austro-Hungarian Empire.

The Wien to Graz line still operates with left-hand running south of Payerbach-Reichenau, but Payerbach-Reichenau - Mürzzuschlag - Bruck a d Mur will convert to right-hand running in December 2019. ÖBB intends to convert Bruck a d Mur - Graz by the time the Koralmbahn opens in full. The only other line with left-hand running is Wien FJB - Tulln - Absdorf-Hippersdorf, an isolated section of double track which will probably be left.

Distances

The best source is the “Eisenbahnatlas Österreich”; see #Printed Maps.

Other Railways

Many of these are government (regional or local) owned, rather than owned by private companies. Table numbers in the Fahrpläne Österreich are shown in brackets and can also be found from this plan.

  • NÖVOG (Niederösterreichische Verkehrsorganisationsges.m.b.H.)
    • St Polten Hauptbahnhof – Mariazell Mariazellerbahn (115) (760mm gauge) Electrified at 6.6 kV 25 Hz.
    • Waidhofen an der Ybbs – Gstadt bei Waidhofen Citybahn Waidhofen (132) (760mm gauge)
    • Puchberg am Schneeberg – Hochschneeberg Schneebergbahn (523) (Metre gauge, rack operated) **Gmünd NÖ – Groß Gerungs Waldviertelbahn (801) (760mm gauge)
    • Gmünd NÖ – Litschau and Heidenreichstein Waldviertelbahn (802) (760mm gauge)
    • Krems an der Donau - Emmersdorf an der Donau Wachaubahn (811)
    • Retz - Drosendorf Reblaus Express (941)
  • Raab-Oedenburg-Ebenfurter Eisenbahn AG: An international railway in joint Austrian and Hungarian ownership, better-known by its Hungarian name, Györ-Sopron Ebenfurti Vasút (GySEV). Raab and Oedenburg are the German names for Györ and Sopron respectively. The line from Ebenfurth to Sopron is electrified at 25 kV 50 Hz and used by dual-frequency ÖBB trains between Sopron and Wien Südbf. GySEV also owns the line between Sopron and Györ, which is entirely in Hungary and electrified at 25 kV 50 Hz.
    • Ebenfurth – Sopron (512)
    • Neusiedl am See – Fertószentmiklós (731).
  • Steiermärkische Landesbahnen (STLB):
    • Gleisdorf – Weiz Nord (531)
    • Feldbach – Bad Gleichenberg (532) Electrified 1000 V dc
    • Peggau-Deutschfelstritz – Ubelbach (540) Electrified 15 kV 16.7 Hz
    • Unzmarkt – Tamsweg Murtalbahn (630) (760 mm gauge) Plans to convert this line to standard gauge have been abandoned, but see ​"Projects under way or planned", below..
    • Mixnitz – St Erhard (760 mm gauge) Electrified 800 V dc. This line is owned by Mixnitz-St.Erhard AG, a wholly owned subsidiary of Veitsch-Radex GmbH, but managed by STLB. It is possible to charter passenger trains or passenger coaches on freight trains.
    • Weiz – Anger - Birkfeld (760 mm gauge) line sold - see Recent Changes, below
  • Stern & Hafferl Verkehrsgesellschaft m.b.H.:
    • Linz Hbf – Peuerbach and Neumarkt-Kalham LILO (143) Electrified 800 V dc, operated by dual-system EMUs into Linz Hbf on 15 kV 16.7 Hz
    • Lambach – Vorchdorf-Eggenberg (160)
    • Vorchdorf-Eggenberg – Gmunden Seebf (161) (metre gauge) Electrified 800 V dc
    • Vöcklamarkt Lokalbahn – Attersee (180) (metre gauge) Electrified 800 V dc
    • Vorchdorf-Eggenberg – Brauerei Eggenberg (freight only).
  • Westbahn Management G.m.b.H: Wien Westbahnhof – Salzburg (100, 101). The first open access operator in Austria; runs an hourly semi-fast service between Wien and Salzburg.
  • Wiener Lokalbahnen AG: Wien Oper – Baden Josefsplatz (515) Electrified, 800 V dc. A long-distance tramway ("inter-urban" in north American parlance), connected to the Wien tram system. Owned by Wiener Stadtwerke AG

Tourist Lines

Listing current at September 2016 with updates where known.

Various lines listed under Other Railways, above, are wholly or largely tourist operations but are not repeated here. Some of the following lines are commercial operations but most are supported by preservation societies.

  • Abenteuer Erzberg (900 mm gauge, underground mine railway) (note: can be reached by Erzbergbahn)
  • Achenseebahn AG: Jenbach Achenseebf – Achensee Schiffstation (metre gauge, rack operated). This line is potentially in danger of closure at the end of the 2019 season owing to poor track condition.
  • Erzbergbahn (Verein Erzbergbahn): Vordernberg Markt – Erzberg (Erzberg - Eisenerz out of service since 2016 because of storm damage)
  • Feistritztalbahn (Feistritztalbahn Betriebsges.m.b.H.) : Birkfeld – Anger – Weiz (760 mm gauge) Operated in conjunction with Club U44. See also Recent Changes, below.
  • Club Florianerbahn: St.Florian – Pichling See (900 mm gauge) (at September 2016 had been out of service for several years but still aspire to reopen the line)
  • Gurkthalbahn: Treibach-Althofen – Pöckstein-Zwischenwässern (760 mm gauge)
  • Höllentalbahn (Österreichische Gesellschaft für Lokalbahnen): Payerbach Ort – Hirschwang (760 mm gauge)
  • Klagenfurt museum tramway (Lendcanaltramway Klagenfurt) (Nostalgiebahnen in Kärnten): (metre gauge)
  • Liliput-Bahn (Liliputbahn Prater G.m.b.H.): Wien's historic 15 inch gauge line - ca. 3.9km circuit in Prater park. Also operate separate Donaupark line.
  • Museumsbahn Ampflwang-Timelkam (Österreichischen Gesellschaft für Eisenbahngeschichte (ÖGEG)): Ampflwang – Timelkam
  • Museums-Lokalbahnverein Zwettl: Zwettl – Schwarzenau
  • Museumstramway Mariazell-Erlaufsee: Mariazell – Erlaufsee
  • Pferde-Eisenbahn (Pferdeeisenbahn Museum & Gaststätte, Rainbach i.M.): (1106mm gauge; short horse-drawn tramway)
  • Regiobahn: [Wien Praterstern - ] Korneuburg – Ernstbrunn
  • Reißeckbahn: Schoberboden – Reißeck (600mm gauge in conjunction with funicular) (formerly operated by Verbund AG - service suspended from 2016 - see Recent changes)
  • Rheinbähnle (Rhein-Schauen Museum und Rheinbähnle): Rheinmündung - Lustenau - Steinbruch (750mm gauge, 750V d/c) (see route map - former maintenance railway of Internationale Rheinregulierung)
  • Rosenthaler Dampfzüge (Nostalgiebahnen in Kärnten): Weizelsdorf – Ferlach
  • Schaubergwerke Kupferplatte: Jochberg, Kitzbühl (600 mm gauge, underground mine railway)
  • Schwazer Silberbergwerk (Schwazer Silberbergwerk Bsucherführung G.m.b.H.): Schwaz/Tirol (narrow gauge, underground mine railway - Die Grubenbahn)
  • Stainzer Flascherlzug: Stainz – Preding-Wieselsdorf (760 mm gauge)
  • Steyrtalbahn (Österreichischen Gesellschaft für Eisenbahngeschichte (ÖGEG)): Grünburg – Steyr Lokalbf (760 mm gauge)
  • Taurachbahn (Club 760): Mautendorf – St Andrä (760 mm gauge)
  • Wälderbähnle (Bregenzerwaldbahn-Museumsbahn Betriebsges.m.b.H): Bezau – Bersbuch (760 mm gauge)
  • Ybbsthalbahn Bergstrecke (Niederösterreichische Lokalbahnen Betriebsges.m.b.H. (NÖLB)): Kienberg-Gaming – Lunz am See - Göstling an der Ybbs (760 mm gauge)
  • Zayataler Schienentaxi (Verein Neue Landesbahn): Mistelbach Interspar - Asparn an der Zaya (connects with Weinvierteldraisine - see below)

Rail cycling is possible on a number of lines:

Metro

Wien has a third rail U-Bahn (much of which is above ground) and several sections of overhead-electrified U-Bahn tramway with metro characteristics. A track plan is available on the Gleisplanweb site.

Trams

Gmunden, Graz, Innsbruck, Linz, Wien (which extends via the Wiener Lokalbahnen into Baden). The Wien system is the largest European network outside Russia.

Track plans for the systems of Graz, Linz, Innsbruck and Wien are available on the Gleisplanweb site, and most were current at 2018 [Linz 2016].

See also Austria - Tram services over obscure routes

Recent and future changes

Projects under way or planned

A letter of intent was signed in March 2019 by the Ministry of Transport to extend the Salzburger Lokalbahn into the city centre.

ÖBB-Infrastruktur will electrify the last remaining section of unelectrified track in Tirol by the end of 2019 at 15 kV 16·7 Hz. This is the 14·4 km of line between Reutte and Schönbichl at the German border. This will include two blockades of the route; from 16 March to 26 April 2019 and from 14 September to 9 November 2019.

Electrification of the Gailtalbahn (Arnoldstein - Hermagor) commenced in July 2018 with a planned completion for December 2019; Hermagor – Kötschach-Mauthen closed to passengers in December 2016. A lengthy closure with bus substitution will take place from 9 July to 14 December 2019, further to a closure in late 2018. The Kärnten Land government envisages that all remaining lines in Kärnten will be electrified by 2025.

Wien U-Bahn Line U4 is to be closed between Längenfeldgasse and Karlsplatz in July and August 2019 for modernisation. Preliminary work has started on rerouting line U2 and transferring part to a new line U5 - see plan here - with target date for implementation of 2023.

Regiobahn have aspirations to restore regular all-year service to the Korneuburg – Ernstbrunn branch.

Electrification of Klagenfurt – Weizelsdorf was agreed in early 2016 by ÖBB and Kärnten Land, although it is not known when this is to be completed. Weizelsdorf – Rosenbach closed to passengers in December 2016.

Electrification of Gänserndorf - Marchegg is part of an upgrade of the Wien - Bernhardstal - [Breclav] line to be completed by 2026.

The plan to convert part of the Murtalbahn (Unzmarkt - Tamsweg) to standard gauge and electrify it has been abandoned. However the line will be reconstructed, with four realignments. Unzmarkt - Murau will be done in 2019 - 2022 and Murau - Tamsweg in 2022 - 2026.

Information (in German) about ÖBB's major infrastructure projects an be found at their website. The major project to improve service between Wien, Graz, Klagenfurth, Villach and Tarvisio [IT], the Südstrecke project, is due for completion in 2026. As part of this project, work continues on the Koralmbahn element, to link Klagenfurt and Graz: the 32 km Koralmtunnel is its centrepiece and target completion date for this section is 2023. The first section between Werndorf and Wettmannstätten (table 550) opened on 12 December 2010.

ÖBB plans to electrify and resignal the section of the Lavanttalbahn (KBS620) from the future junction with the Koralmbahn just north of St Paul as far as Wolfsberg. This will allow fast services to run between Klagenfurt and Wolfsberg via the Koralmbahn.

It is reportedly planned to double sections of the Steirische Ostbahn (Graz – Gleisdorf – Szentgottard [HU]), but information on this is sparse: Wikipedia's Steirische_Ostbahn entry indicates a south to east Graz avoiding line (otherwise any trains between the Koralmbahn and Szentgottard would have to run round in Graz) but states that the start of the project has been delayed due to its relatively low priority in the general transport plan. The project does not appear in OeBB Infra's list of projects.

Threatened passenger lines

The following lines are planned to close at the end of 2019:

  • 132 Waidhofen an der Ybbs Vogelsang - Gstadt (a further cutback of the rump of the narrow-gauge Ybbstalbahn)
  • 133 Sarmingstein – St Nikola (service very limited)
  • 152 Haiding – Aschach an der Donau (service very limited). The Linzer Lokalbahn ("LiLo") should be taking over the Eferding - Aschach section 'in the future'. This would presumably mean an improved service over this part of the line.
  • 912 Groß Schweinbarth – Bad Pirawarth (runs Mondays to Fridays only)
  • 912 Obersdorf - Groß Schweinbarth - Gänserndorf
  • 311 Jenbach - Achensee. The Achenseebahn is potentially in danger of closure at the end of the 2019 tourist season owing to poor track condition. As it is a tourist line, the Tirol region does not wish to subsidise it. However, if it had a daily passenger service, the region would be required by law to do so. The closure threat is no doubt the first stage in an attempt to gain funding for renovation.

The following lines will continue until 2029:

  • 142 Linz Urfahr - Rottenegg – Aigen–Schlägl. The section between Linz Urfahr and Rohrbach was planned for conversion into tram-train operation, with the rest of the line being shut. If train-tram went ahead, at Rohrbach a new line, 2.8 km long, would be built towards the town centre, and at Linz a new line from Urfahr to Hauptbahnhof but the Oberösterreich Land Parliament wishes to keep the existing railway and reconnect it with the main rail network. Current plans suggest that a heavy-rail S-Bahn line may be built to connect Linz Hbf with Linz Urfahr, but completion is not expected until at least 2025.
  • 153 Wels - Grünau im Almtal
  • 171 Attnang-Puchheim – Reid/Innkreis – Schärding
  • (620) Bleiburg – Holmec (Slovenia) - Prevalje has been threatened with closure in the past, but will gain a two-hourly service on Mondays to Saturdays in December 2019 under the designation S11.

In late 2011 OeBB presented their plans for the period to 2025, which included a wish to give up some 700 km of branch lines - either by handing to regional authorities or complete closure. Based on failing to reach a minimum threshold of 2000 passengers per day, the passenger lines identified (other than those already listed above or already closed) are listed below. A note is given of any overt action towards closure that has been reported subsequently.

  • 502 Spielfeld-Strass – Bad Radkersburg
  • 521 Pernitz-Muggendorf – Gutenstein
  • 522 Bad Fischau – Puchberg
  • 820 Hadersdorf – Sigmundsherberg

While not in the above official listing, the following routes have appeared on various closure "threat lists" over the years and may be considered at some risk:

  • 170 Bad Aussee – Stainach-Irdning
  • 172 Vöcklabruck – Kammer-Schörfling
  • 720 [Wien Hbf -] Kledering - Sollenau (Mondays to Fridays only, with very poor loadings)

Innsbrucker Mittelgebirgsbahn, the light rail line to Igls operated as route 6 of the Innsbruck tram system, has in the past been threatened with closure but will now be operated as a Museum Tramway.

Recent changes

The Aspangbahn has been realigned for a distance of around 1km between Laxenburg-Biedermannsdorf and Maria Lanzendorf where it crosses the Pottendorfer Linie (Inzersdorf - Ebenfurth) on a new bridge, 200m north of the previous one.

A further extension of the S31 (Gleisdorf - Weiz) from Weiz Zentrum to Weiz Nord was opened to passengers on 10 September 2018. The section from Weiz Bahnhof to Weiz Zentrum opened on 4 June 2016 when the line to the original terminus at Weiz (formerly Weiz Stadt) was closed.

The Weiz - Oberfeistritz (Steiermärkische Landesbahnen) line has been temporarily cut back to Krottendorfer Hauptstraße (about 1km from Weiz) until the end of 2020, to allow construction of a new bypass road. When the line is reinstated to Weiz, the Feistritztalbahn station will be on the east side of Weiz Bahnhof, rather than in the forecourt on the west side, as previously.

Prior to this, the line was temporarily closed following the last train on 24 December 2014 owing to the poor condition of the Bachl viaduct and the Hardt-Puch tunnel. The Oberfeistritz - Birkfeld section was leased to Club U44, which moved all its rolling stock to the then cut off Birkfeld. However patronage fell considerably in 2015 so the Steiermark Region sold the entire line to the Feistritztalbahn Betriebsges.m.b.H. in February 2016 for a nominal €1 and contributed €235,000 for repairs. The line reopened for seasonal passenger service throughout between Birkfeld and Weiz in April 2016 (see Tourist Lines).

The residual passenger service, mainly for school traffic, between Wolfsberg and Bad St. Leonhard (KBS620) was definitively withdrawn on 10 December 2017. It had been operated by replacement bus since 5 March 2017. The line remains in use for freight.

The 24.7km St Pölten avoiding line opened on 10 December 2017. Although primarily for freight, it is used occasionally by relief passenger trains; see AT19/21

The 4.6km southern extension of Wien U-Bahn line U1 from Reumannplatz to Oberlaa opened on 2 September 2017; from the same date, tram 67 ceased to run south of Reumannplatz.

Reißeckbahn, a funicular and narrow gauge railway from Kolbnitz, was initially to be closed for summer 2016 season to enable engineering work on local hydro power plant, but it now seems possible the line will not reopen. The nearby Kreuzeckbahn may be under some threat, too. See 2015 press report and later 2016 press report (both in German)

Because of storm damage, the Erzbergbahn has operated only between Vordernberg Markt and Erzberg (thence to Eisenerz out of service) since 2016.

Operation by Lavamünder Bahn- und Betriebs GesmbH (LBB) on the closed line between St.Paul and Lavamünd ceased in 2015 - see press report (in German).

A 2.8 km extension of the Salzburger Lokalbahn (SLB) from Trimmelkam to Ostermeithing was inaugurated on 12 December 2014.

Wien Hauptbahnhof was officially opened on 10 October 2014 (although work continued until opening of all facilities - with through services, use of newly built flyovers at the west end and diveunders at the east end - could take place). All long-distance trains from the Westbahn - which formerly used Wien Westbahnhof - now use the Lainzer tunnel and Hauptbahnhof - the replacement for Südbahnhof. The new station had been partially opened on 9 December 2012, in connection with which two U Bahn stations were renamed; Wien Südbahnhof became Quartier Belvedere, and Südtirolerplatz became Wien Hauptbahnhof. At the same time the metro station Südtirolerplatz became Südtirolerplatz-Hauptbahnhof. A new motive power and carriage depot has been built on what has been freight yard and sidings at Matzleinsdorfer Platz between Wien Süd and Meidling.

In December 2014 a flyover was opened across Kledering Yard (Wien Zvbf) to connect the Wien – Hegyeshalom line with Kaiserebersdorf. This provides a direct route between the new Hauptbahnhof and Flughafen Wien (VIE) (the airport), used twice hourly by railjet and Intercity services, as an alternative to the City Airport Train and S7 route to Wien Mitte.

The Wien Hadersdorf - Meidling – Wien Hütteldorf section of the Neue Westbahn opened to freight in late 2012 and to passenger services to Wien Hauptbahnhof in December 2014.

The limited passenger services to/from Wien Westbahnhof to Tulln and beyond via the Tullnerfeld avoiding curve off the Neue Westbahn were rerouted to/from Tulln to terminate at Tullnerfeld station at the December 2014 timetable change.

In early 2014 the metre gauge branch from Vorchdorf-Eggenberg was slightly shortened when its terminal station, Gmunden Seebahnhof, was relocated inland to a new site between Gmunden Traundorf and the old Seebahnhof. Construction started in March 2014 of a new connecting line from this new station to Rathausplatz. The initial section from Seebahnhof to Klosterplatz opened on 14 December 2014. The closed section of the Gmunden town tram line from Rathausplatz to Franz Josef Platz was rebuilt, providing a through route between Gmunden Bahnhof and Vorchdorf-Eggenberg, and opened on 1 September 2018. A sketch map is available.

The seasonal service on the Korneuburg – Ernstbrunn branch ceased in 2014 but had resumed by 2016 with a changed operator Regiobahn. Regiobahn have aspirations to restore regular all-year service to the line.

The Kammer-Schoerfling branch was cut back by around 500m in June 2014, thus eliminating 2 level crossings. A new terminal station was opened on the west side of the current line at a slightly lower level, involving around 200m of new alignment.

The Wien Liesing – Waldmühle branch, which had no booked traffic other than excursions operated by Verein Pro Kaltenleutgebnerbahn, was legally closed in January 2014 but the preservation organisation have resumed services, including some through trips to and from central Wien, since 3 September 2017.

Older Changes

For details of older changes dating back to the year 2005 see Austria - Older General Information.

Special notes

Explanations in English of Austrian (and German) railway signalling can be found here.

Tourist railways up mountains are often of limited capacity, but subject to high demand, particularly at holiday periods and during the winter sports season. In such cases it may be necessary to wait some time before being able to board a train, so it is best to arrive at the railway as early in the day as possible. When booking a trip it is often necessary to reserve a seat on a specific train down the mountain. Once the railway’s capacity to bring people back down the mountain is fully booked, no more can ascend, unless they are staying at a summit hotel.

See also