==National railway system==
==National railway system==
Azerbaijan State Railway: ADDY (''Azərbaycan Dövlət Dəmir Yolu'')
Azerbaijan State Railway: ADDY (''Azərbaycan Dövlət Dəmir Yolu'')
The Azerbaijan and Georgian state railways currently hold sole responsibility for their sections of the Baku – Tbilisi – Kars railway. An equally-owned binational joint venture is to be set up to manage these sections once upgrading works ongoing in 2024 are completed.


==Official Website==
==Official Website==
[http://www.railway.gov.az/ www.railway.gov.az]
[https://ady.az/en Azərbaycan Dəmir Yolları ADY]


==Language==
==Language==
Line 22: Line 24:


===Downloadable Timetable===
===Downloadable Timetable===
A list of Long Distance trains and International trains is given here: [https://ticket.ady.az/en/movement]
A list of Long Distance trains and International trains is given here: [https://ady.az/en/tables/index/52/44]


However, a good [https://drive.google.com/open?id=1e-EYqi7dUH1yCD7m7Uw3pSixKwOlvw08ibkqqQGRbFs privately compiled timetable] is available.
However, a good [https://drive.google.com/open?id=1e-EYqi7dUH1yCD7m7Uw3pSixKwOlvw08ibkqqQGRbFs privately compiled timetable] has been available but the last update was 2016.


===Printed Timetable===
===Printed Timetable===
Line 33: Line 35:
==Maps==
==Maps==
===Printed Maps===
===Printed Maps===
*"World Rail Atlas Vol. 8 The Middle East and Caucasus" by Neil Robinson (ISBN-10: 954-12-0128-8; ISBN-13: 978-954-12-0128-2)
*[[Printed Maps#ERA-E | European Railway Atlas (All-Europe Edition)]] by M.G. Ball.
*[[Printed Maps#NR-VOL8 | World Rail Atlas - The Middle East and Caucasus]] by Neil Robinson.
 
===Web-based Maps===
===Web-based Maps===
*Thorsten Büker's [http://www.bueker.net/trainspotting/map.php?file=maps/azerbaijan--artsakh/azerbaijan--artsakh.gif Map of Azerbaijan] - a single sheet dated January 2010.
*Thorsten Büker's [https://web.archive.org/web/20230128200806/http://www.bueker.net/trainspotting/map.php?file=maps/azerbaijan--artsakh/azerbaijan--artsakh.gif Map of Azerbaijan] - a single sheet dated April 2009 on wayback machine


==Ticketing==
==Ticketing==
Line 42: Line 46:
==Infrastructure==
==Infrastructure==
===Infrastructure Authority===
===Infrastructure Authority===
Not known
Azerbaijan Railways acts as its own Infrastructure Authority. [https://ady.az/en/category/index/50/42]


===Network Statement===
===Network Statement===
Line 65: Line 69:


==Tourist lines==
==Tourist lines==
None.
None but but there are up to two a (former) “Pioneer” public narrow-gauge railway that combined a hobby activity for teenagers with practical training in railway operation. These 'Dyetsky Zelegny Dorogy' (DZD) typically operate on a few km of track in a public park on weekends between 1 May and the start of the new school year. For details, see the Web site (partly in English) [http://www.dzd-ussr.ru/towns/index-eng.html railways.id.ru/towns/towns.html].
.
.


==Metro==
==Metro==
Line 78: Line 84:


==Recent and future changes==
==Recent and future changes==
On 31 May 2021 the complete Baku Metro was reopened, following closure by the pandemic on 19 October 2020.
On 29 May 2021, a 1 km extension of the Baku Metro, Violet line, opened to 8 Noyambr [8 November], doubling the length of this line.
The 36 km cut-off between Güzdək and Qaradağ, avoiding Baku, will be rebuilt as a double-track line. It was opened in 1963, but fell into disrepair in the 1970s.  
The 36 km cut-off between Güzdək and Qaradağ, avoiding Baku, will be rebuilt as a double-track line. It was opened in 1963, but fell into disrepair in the 1970s.  


Line 95: Line 105:
==See also==
==See also==
{{Navbox Azerbaijan}}
{{Navbox Azerbaijan}}
[[Category:General Information]]

Latest revision as of 13:12, 29 March 2024

Country Name

Azerbaijan (Azərbaycan)

National railway system

Azerbaijan State Railway: ADDY (Azərbaycan Dövlət Dəmir Yolu)

The Azerbaijan and Georgian state railways currently hold sole responsibility for their sections of the Baku – Tbilisi – Kars railway. An equally-owned binational joint venture is to be set up to manage these sections once upgrading works ongoing in 2024 are completed.

Official Website

Azərbaycan Dəmir Yolları ADY

Language

Azerbaijani (also called Azeri); 13 other languages are also spoken in the country

Currency

Manat (AZN)

UIC code

Numeric 57; alpha AZE

Timetable

Journey Planner

Can be found at Online Ticket Sales

Downloadable Timetable

A list of Long Distance trains and International trains is given here: [1]

However, a good privately compiled timetable has been available but the last update was 2016.

Printed Timetable

None.

Engineering Information

None.

Maps

Printed Maps

Web-based Maps

  • Thorsten Büker's Map of Azerbaijan - a single sheet dated April 2009 on wayback machine

Ticketing

The Online Ticket Sales booking system allows the purchase of tickets for any long distance train from/to any station and also destinations in Russia and Ukraine) served by direct trains.

Infrastructure

Infrastructure Authority

Azerbaijan Railways acts as its own Infrastructure Authority. [2]

Network Statement

None known

Gauge

"Russian" gauge (1520mm)

Electrification

Historically 3000 V dc but the main line from Baku to Bëyük Kesik on the Georgian border was converted from 3 kV DC to 25 kV 50 Hz in August 2020. It is not known what has occurred on the short branches off this route. The Baku suburban lines and those to Yalama on the Russian border and south westwards to Imisli are presumed to remain 3000 V dc. The compilers would appreciate any information on this.

Rule of the road

Right.

Distances

No source known

Other railways

None.

Tourist lines

None but but there are up to two a (former) “Pioneer” public narrow-gauge railway that combined a hobby activity for teenagers with practical training in railway operation. These 'Dyetsky Zelegny Dorogy' (DZD) typically operate on a few km of track in a public park on weekends between 1 May and the start of the new school year. For details, see the Web site (partly in English) railways.id.ru/towns/towns.html. . .

Metro

Baku

The metro is operated by Baku Metropolitan.

There is track plan of the Baku Metro from 2012 captioned in Cyrillic text.

Trams/LRT-Systems

Trams ceased to operate at Baku in January 2004 (Gauge 1524 mm), but there are plans to re-instate them.

Recent and future changes

On 31 May 2021 the complete Baku Metro was reopened, following closure by the pandemic on 19 October 2020.

On 29 May 2021, a 1 km extension of the Baku Metro, Violet line, opened to 8 Noyambr [8 November], doubling the length of this line.

The 36 km cut-off between Güzdək and Qaradağ, avoiding Baku, will be rebuilt as a double-track line. It was opened in 1963, but fell into disrepair in the 1970s.

The main east-west line from Baku to Bëyük Kesik on the Georgian border was converted from 3 kV DC to 25 kV 50 Hz in August 2020.

The reopening of the Abşeron Peninsula (Baku) circular railway has been completed. It consisted of three phases: 1. May 2019: Modernisation of the line NE from Baku main station to Sabunçu. 2. November 2019: Reopening of Sabunçu to Pirşağı. 3. 18 March 2020: Reopening of Pirşağı – Görədil – Novxanı – Sumqayıt.

In May 2005 the heads of the Russian, Azerbaijani and Iranian railways agreed a joint venture to construct and operate a new line from Astara (Azerbaijan) to Resht and Qazvin (Iran). Construction of the first section between Qazvin and Rasht was completed in March 2011. Astara (Azerbaijan) to Astara (Iran) opened to traffic 29 March 2018.

Baku trams ceased to operate in January 2004.

Special Notes

Azerbaijan includes the Autonomous Republic (muxtar respublika) of Nakhchivan, separated from the rest of the country by Armenia. Armenia controls a number of territories which are formally part of Azerbaijan, surrounding the Armenian enclave of Nagorno-Karabakh.