Border Crossings: Austria - Slovenia: Difference between revisions

From EGTRE
Jump to navigationJump to search
Line 1: Line 1:
==(Spielfeld-Straß -) Bad Radkersburg ÖBB - Gornja Radgona SŽ (- Ljutomer)==
==(Spielfeld-Straß -) Bad Radkersburg ÖBB - Gornja Radgona SŽ (- Ljutomer)==
The bridge over the river Mur was destroyed in 1945. In January 2016 Steiermark region and the Slovenian authorities agreed funding for its rebuilding but co-funding is still required from the Austrian government and the EU cohesion fund.
The bridge over the river Mur was destroyed in 1945. Despite a January 2016 Steiermark region and Slovenian authorities funding agreement for rebuilding [albeit requiring co-funding from the Austrian government and the EU cohesion fund], the scheme has since been dropped.


==(Graz -) Spielfeld-Straß ÖBB - Šentilj SŽ (- Maribor)==
==(Graz -) Spielfeld-Straß ÖBB - Šentilj SŽ (- Maribor)==

Revision as of 14:32, 24 December 2020

(Spielfeld-Straß -) Bad Radkersburg ÖBB - Gornja Radgona SŽ (- Ljutomer)

The bridge over the river Mur was destroyed in 1945. Despite a January 2016 Steiermark region and Slovenian authorities funding agreement for rebuilding [albeit requiring co-funding from the Austrian government and the EU cohesion fund], the scheme has since been dropped.

(Graz -) Spielfeld-Straß ÖBB - Šentilj SŽ (- Maribor)

[E*] SŽ works to Spielfeld Straß. Though there are switchable tracks here, they do not seem to be used as such, with the locomotives of incoming hauled trains being shunted back to their own end of the station.

(St. Paul - Lavamünd ÖBB -) Rabenstein - Dravograd SŽ

Line closed.

(Klagenfurt -) Bleiburg ÖBB - Holmec SŽ (- Dravograd)

[D] SŽ diesel railcars work to Bleiburg.

(Villach -) Rosenbach ÖBB - Jesenice SŽ (- Ljubljana)

[E*] The change in electrification is at the midpoint of Jesenice station. The locomotives of incoming hauled trains are shunted back to their own end of the station. ÖBB works to Jesenice, with DB electric locomotives on some trains.

See also