Border Crossings: Latvia - Lithuania: Difference between revisions

From EGTRE
Jump to navigationJump to search
Line 2: Line 2:


==(Daugavpils -) Kurcums LDz - Turmantas LG (- Švenčioneliai - Vilnius)==
==(Daugavpils -) Kurcums LDz - Turmantas LG (- Švenčioneliai - Vilnius)==
[D] This route carried one daily train pair between St Peterburg and Vilnius, which was withdrawn at the end of May 2015. LG worked to Daugavpils.
[D] LG works to Daugavpils. A weekend only passenger service was reinstated on 4 April 2018. This route previously carried one daily train pair between St Peterburg (Russia) and Vilnius, which was withdrawn at the end of May 2015.


==(Daugavpils -) Eglainē LDz - Obeliai<ref>LG Network Statement</ref> LG (- Rokiškis - Radviliškis)==
==(Daugavpils -) Eglainē LDz - Obeliai<ref>LG Network Statement</ref> LG (- Rokiškis - Radviliškis)==

Revision as of 12:22, 21 November 2018

All rail routes between this pair of countries are 1520mm gauge.

(Daugavpils -) Kurcums LDz - Turmantas LG (- Švenčioneliai - Vilnius)

[D] LG works to Daugavpils. A weekend only passenger service was reinstated on 4 April 2018. This route previously carried one daily train pair between St Peterburg (Russia) and Vilnius, which was withdrawn at the end of May 2015.

(Daugavpils -) Eglainē LDz - Obeliai[1] LG (- Rokiškis - Radviliškis)

[D] No passenger service.

(Riga - Jelgava -) Meitene LDz - Šarkiai LG (- Šiauliai - Vilnius)

[D] During the summer of 2018 Ukrainian railways operates seasonal train 31/32 Riga-Vilnius-Minsk-Kyiv via Siauliai.

(Riga - Jelgava -) Reņge LDz - Laižuva LG (- Mažeikiai)

[D] This line was closed on 23 February 2010, when the (Rīga -) Jelgava - Renge service was withdrawn after the Lithuanians lifted the tracks on their side of the border in 2008 to prevent oil trains from the huge Mažeikiai refinery exporting their products via Ventspils. This action was declared illegal by an EU court, which required LG to have relaid the track by March 2012. In October 2017 the European Commission fined LG €27.9m and ordered them to ‘bring the infringement to an end’. LG announced in October 2017 that it would be rebuilt "shortly" but as at September 2018 the track had still not been relaid. LDz is now suing LG.

(Priekule -) Vaiņode LDz - Lūšé LG (- Mažeikiai)

[D] Line closed and cut at Bugeniai.

(Priekule -) Kaleti LDz - Skuodas LG (- Klaipeda)

[D] Line closed.

References

  1. ^ LG Network Statement

See also