Border Crossings: Poland - Slovakia: Difference between revisions

From EGTRE
Jump to navigationJump to search
Line 9: Line 9:


==Zwardoń PKP - Skalité-Serafínov ŽSR (- Čadca)==
==Zwardoń PKP - Skalité-Serafínov ŽSR (- Čadca)==
[E] ŽSSK works services to Zwardoń. Electrification was completed in December 2002. There are four local train pairs across the border in 2018-19. Long distance trains via this route have ceased.
[E] ŽSSK works services to Zwardoń. Electrification was completed in December 2002. Long distance trains via this route have ceased as the four train pairs across the border in 2018-19 all start/terminate at Zwardon.


== See also ==
== See also ==

Revision as of 10:31, 17 December 2018

Łupków PKP - Medzilaborce mesto ŽSR

[D] ŽSSK worked to Łupków when passenger services ceased on 29 August 2010, but reopened SSuO 1 July 2017. These summer only train pairs, one SSuO and the other SO are worked by PKP DMU's.

(Muszyna -) Leluchów PKP - Čirč ŽSR (- Plaveč)

[E] PKP works to Plaveč. After serious flood damage washed away a bridge north of Muszyna on 4/5 June 2010 the line was completely closed until 17 January 2011 but only freight traffic resumed.

(Nowy Targ -) Podczerwone PKP - Sucha Hora ŽSR (- Trstená)

Line closed and lifted. A bridge was blown up at the beginning of World War 2, thereby closing the border crossing. Czarny Dunajec - Podczerwone closed to all traffic in 1989 and Trstená - Sucha Hora in 1973.

Zwardoń PKP - Skalité-Serafínov ŽSR (- Čadca)

[E] ŽSSK works services to Zwardoń. Electrification was completed in December 2002. Long distance trains via this route have ceased as the four train pairs across the border in 2018-19 all start/terminate at Zwardon.

See also