Border Crossings: Russia - Turkey: Difference between revisions

From EGTRE
Jump to navigationJump to search
m ({{Navbox Turkey}})
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
==Kavkaz RŽD - Samsun TCDD {train ferry}==
==Kavkaz RŽD - Samsun TCDD {train ferry}==
Freight only. Operations will begin on 19 February 2013. RŽD wagons compatible with the Turkish loading gauge will have their wheel sets replaced at Samsun.
Freight only. Operations began on 19 February 2013. RŽD wagons compatible with the Turkish loading gauge have their wheel sets replaced at Samsun. Operation ceased in April 2015 owing to the closure of the line to Samsun for rebuilding. The line reopened on 4 May 2020 but it is not known as at February 2021 if the train ferry has resumed operation.
 
== See also ==
== See also ==
* [[Russia]]
* [[Turkey]]
* [[Border Crossings - General Information]]
* [[Border Crossings - General Information]]


{{Navbox Russia}}
{{Navbox Turkey}}
{{Navbox Turkey}}


[[Category:Border Crossings|Russia - Turkey]]
[[Category:Border Crossings|Russia - Turkey]]

Revision as of 14:18, 29 January 2021

Kavkaz RŽD - Samsun TCDD {train ferry}

Freight only. Operations began on 19 February 2013. RŽD wagons compatible with the Turkish loading gauge have their wheel sets replaced at Samsun. Operation ceased in April 2015 owing to the closure of the line to Samsun for rebuilding. The line reopened on 4 May 2020 but it is not known as at February 2021 if the train ferry has resumed operation.

See also