Border Crossings: France - United Kingdom: Difference between revisions
From EGTRE
Jump to navigationJump to search
Paul Steane (talk | contribs) (Created page with "==(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR== [E*] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eur...") |
|||
Line 1: | Line 1: | ||
==(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR== | ==(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR== | ||
[E | [E] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eurotunnel works trains) using it must be equipped with TVM430 cab signalling. | ||
== See also == | == See also == |
Revision as of 19:12, 2 January 2012
(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR
[E] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eurotunnel works trains) using it must be equipped with TVM430 cab signalling.