Border Crossings: France - United Kingdom: Difference between revisions

From EGTRE
Jump to navigationJump to search
(Created page with "==(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR== [E*] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eur...")
 
Line 1: Line 1:
==(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR==
==(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR==
[E*] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eurotunnel works trains) using it must be equipped with TVM430 cab signalling.  
[E] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eurotunnel works trains) using it must be equipped with TVM430 cab signalling.


== See also ==
== See also ==

Revision as of 19:12, 2 January 2012

(Lille -) Calais-Fréthun SNCF - Channel Tunnel - Cheriton/Ashford International/Sandling NR

[E] The Channel Tunnel is electrified at 25 kV 50 Hz; all trains (other than Eurotunnel works trains) using it must be equipped with TVM430 cab signalling.

See also