Kenya - General Information: Difference between revisions

From EGTRE
Jump to navigationJump to search
Line 3: Line 3:


==National Railway System==
==National Railway System==
[http://www.krc.co.ke/joomla/ Kenya Railways Corporation]
Kenya Railways Corporation (KRC), also Kenya Railways (KR) is the national railway of Kenya. Established in 1977, KR is a state corporation.


[http://www.riftvalleyrail.com/ Rift Valley Railways] is the concessionaire of the Kenya-Uganda railway.
Train services are operated by [http://www.riftvalleyrail.com/ Rift valley railways], the concessionaire of the Kenya-Uganda railway.


==Distances in km==
==Official Website==
The [http://www.rec.ke KRC website] does not work.
 
==Language==
The national language is Kiswahili; the official languages are Kiswahili and English
 
==Currency==
Kenyan shilling (KES)
 
==UIC code==
None
 
==Timetable==
===Journey Planner===
A basic list of frequencies is given for:
*[http://www.riftvalleyrail.com/inter-city Inter City]
*[http://www.riftvalleyrail.com/passenger Nairobi Commuter]
 
===Downloadable Timetable===
None
 
===Printed Timetable===
None known
 
===Engineering Information===
None known
 
===Bus Information===
Not known
 
==Maps==
===Printed Maps===
 
===Web-based Maps===
None known
 
==Ticketing==
[http://www.riftvalleyrail.com/images/stories/docs/ALL%20INCLUSIVE%20NRB-MSA.PDF Passenger Train Schedules with effect from 1.1.2012]
 
==Gauge==
Metre, but see "Recent and future changes", below.
 
==Electrification==
There are no electrified lines in Kenya.
 
==Rule of the road==
Left but the system is almost entirely single track
 
==Other Railways==
None.
 
==Tourist Lines==
None.
 
==Metro==
None.
 
==Trams==
None.
 
==Recent and future changes==
On 28 November 2013, the President of Kenya inaugurated the construction of the first standard (1435 mm) gauge line in the country, connecting
Mombasa and Nairobi. The 500 km line will cost of 4.1 billion euros (85% financed by Chinese Exim Bank) and should be completed by the end of 2018.
Passenger trains will run at 160 km/h, reducing the journey time from 13 hours to 4 hours, and freight trains at 100 km/h. A second phase would see
the line extended from Nairobi to Malaba, near the border with Uganda, and eventually to Kampala.
 
==Special Notes==
 
Distances in km:


{|
{|

Revision as of 19:56, 7 January 2014

Country Name

Kenya (officially the Republic of Kenya)

National Railway System

Kenya Railways Corporation (KRC), also Kenya Railways (KR) is the national railway of Kenya. Established in 1977, KR is a state corporation.

Train services are operated by Rift valley railways, the concessionaire of the Kenya-Uganda railway.

Official Website

The KRC website does not work.

Language

The national language is Kiswahili; the official languages are Kiswahili and English

Currency

Kenyan shilling (KES)

UIC code

None

Timetable

Journey Planner

A basic list of frequencies is given for:

Downloadable Timetable

None

Printed Timetable

None known

Engineering Information

None known

Bus Information

Not known

Maps

Printed Maps

Web-based Maps

None known

Ticketing

Passenger Train Schedules with effect from 1.1.2012

Gauge

Metre, but see "Recent and future changes", below.

Electrification

There are no electrified lines in Kenya.

Rule of the road

Left but the system is almost entirely single track

Other Railways

None.

Tourist Lines

None.

Metro

None.

Trams

None.

Recent and future changes

On 28 November 2013, the President of Kenya inaugurated the construction of the first standard (1435 mm) gauge line in the country, connecting Mombasa and Nairobi. The 500 km line will cost of 4.1 billion euros (85% financed by Chinese Exim Bank) and should be completed by the end of 2018. Passenger trains will run at 160 km/h, reducing the journey time from 13 hours to 4 hours, and freight trains at 100 km/h. A second phase would see the line extended from Nairobi to Malaba, near the border with Uganda, and eventually to Kampala.

Special Notes

Distances in km:

Nairobi – Mombasa 530
Nairobi – Nakuru – Kisumu 398
Kisumu – Butere 69