Morocco - General Information: Difference between revisions

From EGTRE
Jump to navigationJump to search
No edit summary
No edit summary
Line 59: Line 59:


A new railway line opened on the 17th June 2009 between Tanger Ville and the huge new port of Tanger Med.  The line has passenger services to Ksar Sghir, from where a coach connection is made to Tanger Med. The line to Tanger Med will eventually open to passenger trains as well, but no date has been set.  
A new railway line opened on the 17th June 2009 between Tanger Ville and the huge new port of Tanger Med.  The line has passenger services to Ksar Sghir, from where a coach connection is made to Tanger Med. The line to Tanger Med will eventually open to passenger trains as well, but no date has been set.  
-
The new railway from Taourirt to Beni Ksar Port was officially opened by King Mohammed VI on 10th July 2009, along with the two new stations at Nador, the major city on the line.
The new railway from Taourirt to Beni Ksar Port was officially opened by King Mohammed VI on 10th July 2009, along with the two new stations at Nador, the major city on the line.
In 2010 a new 27km cut-off  between Sidi Yahya El Gharb and Mechraa Bel Ksiri allowed trains from Casablanca to Tanger to avoid the longer route via Sidi Kacem.
In 2010 a new 27km cut-off  between Sidi Yahya El Gharb and Mechraa Bel Ksiri allowed trains from Casablanca to Tanger to avoid the longer route via Sidi Kacem.

Revision as of 18:39, 14 June 2011

Country Name

Morocco (Maroc)

National railway system

ONCF ( ONCFM in French - Office National des Chemins de Fer du Maroc)

Official Website

www.oncf.ma/index_en.aspx

Language

Arabic and French

Currency

Moroccan Dirham, symbol MAD

UIC code

Numeric 93; alpha MA

Timetable

Journey Planner

[http://www.oncf.ma/index_en.aspx]

Downloadable Timetable

www.oncf.ma/Fr/index.aspx?md=203&rb=416. This link may need to be cut and pasted into your browser. Note that timetables often carry on out of the nominal date range until superseded.

Printed Timetable

None

Engineering Information

None

Maps

World Railway Atlas Vol. 7 North, East and Central Africa by Neil Robinson

Gauge

Standard

Electrification

3kV DC. All passenger lines are electrified except for Fes to Oujda. Though electrified the line from Tanger Ville to Ksar Sghir is operated by diesel locomotives.

Rule of the road

Left

Other Railways

None

Tourist Lines

None

Metro

None.

Trams

  • Rabat – Sale. Revenue earning services started on 23rd May 2011 with the final five stops on line 2 expected to start in June 2011.

Website at www.tramway-maroc.com. A map may be found at www.urbanrail.net/af/rabat/rabat.htm

  • Casablanca. Under construction and scheduled to open at the end of 2012

Recent and future changes

A new railway line opened on the 17th June 2009 between Tanger Ville and the huge new port of Tanger Med. The line has passenger services to Ksar Sghir, from where a coach connection is made to Tanger Med. The line to Tanger Med will eventually open to passenger trains as well, but no date has been set. - The new railway from Taourirt to Beni Ksar Port was officially opened by King Mohammed VI on 10th July 2009, along with the two new stations at Nador, the major city on the line. In 2010 a new 27km cut-off between Sidi Yahya El Gharb and Mechraa Bel Ksiri allowed trains from Casablanca to Tanger to avoid the longer route via Sidi Kacem. The opening of Morocco’s first high speed line between Tanger and Kénitra is planned for December 2015. This 200 route-km section is the first phase of the planned Tanger – Casablanca high speed line.

Special Notes

The line from Oujda to Maghnia in Algeria has been closed for political reasons for some years, so Morocco has no rail connections to other countries.