Related changes
From EGTRE
Jump to navigationJump to search
Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
17 May 2024
10:57 | Spain - General Information diffhist +125 Geoff Blyth talk contribs (→Changes in 2022: direct Madrid - Orihuela AVE start) |
7 May 2024
|
13:58 | Spain - General Information 2 changes history −5 [Paul Steane; Geoff Blyth] | |||
|
13:58 (cur | prev) −157 Geoff Blyth talk contribs (→Metre gauge lines: Los Cotos closure now in effect) | ||||
|
12:58 (cur | prev) +152 Paul Steane talk contribs (→Changes in 2024: Cercedilla - Los Cotos closure from 6 May for one year) |
29 April 2024
16:07 | Spain - General Information diffhist +105 Geoff Blyth talk contribs (→Changes in 2022: Monforte de Lemos - Lugo closure) |
27 April 2024
|
m 09:28 | Spain - General Information 2 changes history +2 [Geoff Blyth (2×)] | |||
m |
|
09:28 (cur | prev) +2 Geoff Blyth talk contribs (→Electrification) | |||
m |
|
09:27 (cur | prev) 0 Geoff Blyth talk contribs (→Electrification) |