Related changes

From EGTRE
Jump to navigationJump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Show my edits | Show bots | Show minor edits
Show new changes starting from 12:42, 16 June 2024
   
 
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

16 June 2024

     11:44  Italy (Veneto) - Lines with Obscure or Sparse passenger services diffhist −294 Matteo Latella talk contribs (→‎Padova north-south avoiding line: Vigodarzere (G.S. Altichiero) – Padova Campo Marte: no overnìght train in the summer)
     11:29  Italy (Lombardia) - Lines with Obscure or Sparse passenger services‎‎ 3 changes history −428 [Matteo Latella‎ (3×)]
     
11:29 (cur | prev) −352 Matteo Latella talk contribs (→‎Milano Porta Romana – Milano Rogoredo)
     
11:09 (cur | prev) −55 Matteo Latella talk contribs (→‎Milano Porta Garibaldi (Bivio Ghisolfa) – Bivio Musocco – Triplo Bivio Seveso – Milano Greco Pirelli)
     
10:40 (cur | prev) +78 Matteo Latella talk contribs (→‎Obscure services: general updates)
     10:54  Italy - General Information‎‎ 3 changes history +839 [Paul Steane‎; Matteo Latella‎; Geoff Blyth‎]
     
10:54 (cur | prev) −8 Paul Steane talk contribs (→‎Other Railways: link to Ferrovie del Gargano Timetable improved)
     
10:17 (cur | prev) +121 Geoff Blyth talk contribs (→‎Other Railways: Ferrovia del Gargano - timetable PDF added)
     
09:30 (cur | prev) +671 Matteo Latella talk contribs (→‎Other Railways)
     09:11  Italy (Calabria) - Lines with Obscure or Sparse passenger services diffhist +223 Matteo Latella talk contribs (→‎Camigliatello Silano – S Nicola-Silvana Mansio (Ferrovie della Calabria): 2024 suspension)

15 June 2024

10 June 2024

     14:55  Switzerland - General Information‎‎ 2 changes history +582 [Martin Baumann‎ (2×)]
     
14:55 (cur | prev) +256 Martin Baumann talk contribs (→‎Openings (new lines replacing other lines): added new Albula tunnel and corrected some dates)
     
14:30 (cur | prev) +326 Martin Baumann talk contribs (→‎Alternative lines under construction: Added Zermatt deviation and moved new Albula tunnel)

6 June 2024

     16:05  Switzerland - General Information‎‎ 3 changes history +322 [Martin Baumann‎ (3×)]
     
16:05 (cur | prev) +43 Martin Baumann talk contribs (→‎Other Railways)
     
16:03 (cur | prev) +174 Martin Baumann talk contribs (→‎Temporary closures: Chavornay to Orbe)
     
16:00 (cur | prev) +105 Martin Baumann talk contribs (→‎New or alternative lines planned: Orbe-Chavornay update)

2 June 2024

27 May 2024

22 May 2024

     17:09  Italy (Campania) - Lines with Obscure or Sparse passenger services diffhist +430 Matteo Latella talk contribs (→‎[Roma] – 1° Bivio Gricignano – Gricignano-Teverola – [Napoli Centrale]: additional diversions)
     13:10  Switzerland - General Information‎‎ 2 changes history +37 [Ken Romford‎ (2×)]
     
13:10 (cur | prev) +520 Ken Romford talk contribs (→‎Temporary closures: add Rheineck - Walzenhausen)
     
12:58 (cur | prev) −483 Ken Romford talk contribs (→‎Closures proposed but not going ahead: move Rorschach - Heiden and Rheineck - Walzenhausen to Older General Information; add the latter In revised form to Temporary Closures)

21 May 2024

19 May 2024