Luxembourg - General Information

From EGTRE
Revision as of 15:14, 14 December 2015 by Doughnut City (talk | contribs) (→‎Trams)
Jump to navigationJump to search

Country Name

Luxembourg

National Railway System

National Railway Operator

Chemins de fer Luxembourgeois (CFL).

Language

Letzebuergesch, French and German

Currency

Euro

UIC code

numeric 82; alpha L

Timetable

Journey Planner

Liaisons - recherche

Downloadable Timetable

Horaires nationaux en PDF

Printed Timetable

Indicateur Officiel, printed in French and issued annually. It has an introduction in English, French and German. There is a separate timetable of bus services. The international timetable is published in separate sections, to reflect the differing timetables change dates of adjacent countries. A route diagram in the timetable shows all stations.

Engineering Information

Infos trafic

Bus Information

Horaires et réseaux - Bus

Maps

Printed Maps

  • European Railway Atlas: France, Netherlands, Belgium, Luxembourg by M.G. Ball (1991) (ISBN 0-7110-2011-6)
  • European Railway Atlas by M.G. Ball (2008 onwards)

Web-based Maps

  • Sporenplan has a schematic track diagram. Click on "Sporenplannen" on the left hand side for a map showing the countries covered.
  • Thorsten Büker's Benelux Map.

Infrastructure

Infrastructure Authority

The Administration des Chemins de Fer (ACF) is the national authority for the railways.

Network Statement

Documents de référence du réseau > Network Statement DRR 2014 (english version)

Gauge

Standard

Electrification

Sterpenich/Kleinbettingen to Luxembourg (used by SNCB) is 3 kV dc; the rest is at 25 kV 50 Hz. All CFL passenger routes are electrified.

Rule of the road

Right (except for the Sterpenich - Luxembourg section which is used by SNCB and has left hand running).

Distances

Detailed distances for each line are given in the Network Statement Appendix 3A: The Luxembourg Rail Network

Other Railways

None.

Tourist Lines

  • L'Association des Musee et Tourisme Ferroviaires (AMTF) (Train 1900) (standard gauge, 8km length): Pétange (close to CFL station) to Bois de Rodange with reversal at Fond de Gras. A connection with the CFL network at Pétange sees occasional through excursion trains.
  • Minièresbunn Doihl asbl (MBD) (700 mm gauge): a preserved mining line, from Fond de Gras via Doihl and through a 1400 m long tunnel to Lasauvage. Thence are two branches: to Saulnes [France] and to Lasauvage Eglise. Part (including the tunnel) is electrified at 500 V dc while other sections are worked by steam or diesel.
  • Musée National de Mines de Fer (700 mm gauge 4.2 km circuit): a preserved mining line at Rumelange.

Metro

None

Trams

LuxTarm a new tram line now under construction is expected to open in part from the depot at Kirchberg [Luxexpo} to Pont Rouge by late 2017. Completion of this first line through to Gare Centrale by 2020. Other extensions to system e.g. encompassing the Airport are projected beyond 2021.

Recent and Future Changes

The line between Luxembourg and Oetrange via Sandweiler Contern was closed between 16 February and 12 December 2015 as part of the work to double the line between Luxembourg and Sandweiler Contern (see below).

The extension of the line across the border from Dudelange to Volmerange-les-Mines in France opened to public traffic on 15 December 2003.

Work has progressed on the following projects:

  • Gare Centrale is undergoing a long-term rebuilding programme to increase capacity, started in 2006.
  • A new parallel viaduct at Pulvermuhle (just north of Luxembourg) now with completion in 2018-9.
  • Double tracking of the line from Hamm to Sandweiler
  • A new line to be built from Howald to Bettembourg. The first phase, covering construction of the new line and temporary connections to the existing line at Howald and Bettembourg, was approved in January 2014. Preliminary work started in January 2015 and the line should be completed in 2020. The second phase, lasting until 2024, has not yet been approved.
  • New line built from Belval Universite (formerly Belval-Usines) to Belval Mairie commissioned in 2010.
  • Double tracking of the line from Hollerich to Petange completed in December 2012.
  • The new line from Hamm (west curve) and Sandweiler (east curve) to Findel Airport and Kirchberg Expo with target completion end of 2016.

Other plans (see brochure) include:

  • Double tracking of the line from Rodange to Longwy
  • A new tunnel to be built between Belval to Oberkorn
  • Modernisation of the Luxembourg to Kleinbettingen line
  • A new direct line to be built from Cessange to Esch
  • Modernisation of the Dommeldange to Ettelbruck line
  • Double tracking and a new platform to be built at Michelau
  • 4 new 'peripherique' gares to be constructed at Howald, Cessange, Kirchberg and Dommeldange and linked by tramway.

Special Notes

Locomotives of four countries (Belgium, France, Luxembourg, and Germany) regularly work into Luxembourg City station. CFL provides the only passenger service to Audun-le-Tiche and Volmerange les Mines (France).

See also