Search results

From EGTRE
Jump to navigationJump to search
View ( | ) (20 | 50 | 100 | 250 | 500)
  • ...rinted Maps#ERA-R-1 | European Railway Atlas (Regional Atlas Series, Book 1: Norway, Sweden, Finland, Denmark, Great Britain, Ireland, Portugal, Spain, ...19 9). In full colour to a scale of 1:550,000 and with a register of over 1,000 stations. ...
    18 KB (2,768 words) - 19:45, 23 April 2024
  • [140,141] (ERA-E 89C2; ERA-R 204A3) SK24/1 ...nstruction works in Bratislava-Vinohrady (single-track operation, platform 1 closed, only platform 2 in use in direction Bratislava Vajnory) westbound s ...
    9 KB (1,285 words) - 14:38, 10 May 2024
  • Neuss Hbf is in two parts, the eastern platforms 1-4 and the western platforms 5-8, with separate approach tracks to each from ...January, 19-21 February; MWFO 22 March - 5 April, 13 May - 12 June; Daily 1 November - 14 December 2024 ...
    30 KB (4,732 words) - 13:13, 24 May 2024
  • ...ollowing exactly the same alignment - in passenger use: ''1.'' fast lines (1 and 2); ''2.'' suburban or slow lines (1bis and 2bis), and ''3.'' erstwhile ...eneuve St.Georges and Vigneux sur Seine there are three pairs of tracks: ''1.'' 1B and 2B; ''2.'' 1C and 2C, and ''3.'' 1M and 2M. The B tracks are used ...
    9 KB (1,584 words) - 14:19, 9 December 2023
  • ===Avignon Centre – Remoulins - Nîmes (Poste 1)=== ===<div id="OCC_VRN"></div>Villeneuve-lès-Avignon – Remoulins - Nîmes (Poste 1)=== ...
    2 KB (372 words) - 14:28, 9 December 2023
  • ...& Ireland", which is widely available in the UK, shows Irish Railways at 1:1,070,000. ...rinted Maps#ERA-R-1 | European Railway Atlas (Regional Atlas Series, Book 1: Norway, Sweden, Finland, Denmark, Great Britain, Ireland, Portugal, Spain, ...
    9 KB (1,343 words) - 21:25, 17 February 2024
  • Egyptian Pound [EGP] as of 12/20 approximate value £1 = EGP 21 ...the Sand - The History of Egypt and its Railways" (2003 - ISBN 1-900467-15-1) which is still available, but contains no really useful maps. ...
    12 KB (1,947 words) - 22:10, 17 February 2024
  • ...) were amalgamated as a government-owned company, Deutsche Bahn AG (DB) on 1 January 1994. | 501.1 ...
    20 KB (2,634 words) - 14:46, 27 March 2024
  • On 1 November 2013, passenger services were withdrawn on the Linha do Vouga betw From 1 January 2012 Torre das Vargens - Elvas - Badajoz (Spain) and Beja - Funchei ...
    5 KB (819 words) - 10:12, 20 April 2024
  • ...nnounced plans for further competitive tendering. This first contract, Lot 1 Sør, covered inter-city services on the Sørlandet line to Stavanger, Jærban ...rinted Maps#ERA-R-1 | European Railway Atlas (Regional Atlas Series, Book 1: Norway, Sweden, Finland, Denmark, Great Britain, Ireland, Portugal, Spain, ...
    22 KB (3,296 words) - 15:02, 23 May 2024
  • ...lemented in August or December 2009. In August it was announced that up to 1,874 km of lines could close in December 2009. After a number of different l ...track closures, Nógrádszakál to Ipolytamóc (Part 78) for a few months from 1 July 2006 following flood damage (now resumed but one of the threatened 28 ...
    11 KB (1,761 words) - 21:23, 17 February 2024
  • ...Table 12 route between Šabac and Loznica re-opened to passenger traffic on 1 September 2018; services were planned to be extended to Zvornik Novi in Bos Beograd Glavna Železnička Stanica terminus closed on and from 1 July 2018, following completion of the relevant development work, original ...
    13 KB (2,061 words) - 21:38, 17 February 2024
  • {{Map Refs ERA-E}} {{Map Refs ERA-R-1}} ...entries refers to [[Printed Maps#SW-FR-1 | Eisenbahnatlas Frankreich Band 1: Nord]] by Schweers + Wall. ...
    5 KB (692 words) - 17:04, 18 February 2024
  • ...onno run via a tunnel below the line from Milano Cadorna and use platforms 1 and 2 on the west side of Milano Bovisa Politecnico station. Trains using the west-facing terminal platforms, 1 to 12, are obliged to run via Bivio Musocco as are those calling at Villapi ...
    17 KB (2,692 words) - 15:10, 10 April 2024
  • ...urt am Main and Mannheim via Biblis, this route will not be served between 1 and 19 January and between 16 July and 14 December 2024. D1: Not 1-19 January or 16 July - 14 December 2024 ...
    16 KB (2,267 words) - 16:33, 10 April 2024
  • ...took over the assets and operations of the privately owned Edelaraudtee on 1 January 2014, ...l traffic to and from Russia and Belarus, other than transit freight, from 1 January 2023. ...
    7 KB (1,049 words) - 15:34, 12 April 2024
  • ...traffic) on an as required basis and was closed with effect from February 1 1982. The Oder bridge remains in place and the border crossing was reopened ...r 2022 timetable, with two pairs at weekends extended to/from Cottbus from 1 April 2023. Freight traffic remains worked by PKP to Guben. ...
    8 KB (1,348 words) - 19:04, 28 April 2024
  • ...August 2010, but the current Summer only services that recommenced SSuO on 1 July 2017 are worked by PKP DMU's. In 2024 there are two pairs SSuO between ...ŽSSK that run between 30 December 2023 and 25 February 2024, and 1 June to 1 September 2024. ...
    2 KB (250 words) - 14:03, 11 December 2023
  • ...rinted Maps#ERA-R-1 | European Railway Atlas (Regional Atlas Series, Book 1: Norway, Sweden, Finland, Denmark, Great Britain, Ireland, Portugal, Spain, ...cos/diretorio-da-rede-ips] (Network Statement, annex 3.2.1 and annex 3.3.1.1). ...
    15 KB (2,323 words) - 16:28, 4 May 2024
  • *Depot workings to Vagnhallen Majorna Jaegerdorffsplatsen on route 1: **On route 1 or 7 from Tynnered Opaltorget ...
    9 KB (1,067 words) - 15:20, 14 June 2023
View ( | ) (20 | 50 | 100 | 250 | 500)