Note that there is a one hour time difference between Finland and Sweden.
==Tornio/Torneå VR - Haparanda TRV==
==Tornio/Torneå VR - Haparanda TRV==
[DE] Freight only. A single Swedish 1435mm gauge track extends to Tornio and a Finnish 1524mm gauge track to Haparanda. The two lines are interlaced across the border bridge. Standard gauge trains to Tornio yard mainly convey containers, which are transferred to Finnish wagons. Broad gauge trains to Haparanda yard are mainly vans whose contents are transhipped to standard gauge vans. A Talgo gauge changer was tested at Haparanda but now seems to be out of use (to keep it operational in winter de-icing sprays were necessary). At Tornio a German DB/Rafil gauge changer is now in small-scale commercial use. There are also facilities for changing wagon bogies here. A study is underway to rationalize the two yards to just one. The upgrading of Boden - Morjärv - Kalix and building of a new line Kalix - Haparanda and electrification of both is completed. The last train Morjärv - Karungi - Haparanda operated 8 December 2012. The line is now isolated and the track will be removed when the wheather permits.
[DE] Freight only. A single Swedish 1435 mm gauge track extends to Tornio and a Finnish 1524 mm gauge track to Haparanda. The two lines are interlaced across the border bridge. Broad gauge trains to Haparanda yard are mainly vans, whose contents are transshipped to standard gauge vans. Although no official document has been seen, it is understood that all transshipment has taken place at Haparanda since autumn 2012 because the certificate for the 70 ton gantry crane at Tornio yard is said to have expired at the end of 2012. Thus there are no longer any Swedish freight trains to Tornio. According to a Swedish driver, the only standard gauge activity to be expected in Tornio is the occasional transfer (only a few times a year) of track machines, which are re-gauged. A Finnish diesel shunts Haparanda normally once or twice every weekday. The upgrading of Boden - Morjärv - Kalix and building of a new line Kalix - Haparanda and electrification of both is complete. The last train Morjärv - Karungi - Haparanda operated 8 December 2012. The old line is now isolated and the track will be removed when the weather permits.</br>
Electrification work on the the Finnish side, which includes the cross-border section, started at the beginning of April 2023.


==Turku/Åbo VR - Stockholm Värtan TRV==
==Turku/Åbo VR - Stockholm Värtan TRV==
Line 6: Line 9:


== See also ==
== See also ==
* [[Finland]]
* [[Sweden]]
* [[Border Crossings - General Information]]
* [[Border Crossings - General Information]]



Latest revision as of 16:07, 10 December 2023

Note that there is a one hour time difference between Finland and Sweden.

Tornio/Torneå VR - Haparanda TRV

[DE] Freight only. A single Swedish 1435 mm gauge track extends to Tornio and a Finnish 1524 mm gauge track to Haparanda. The two lines are interlaced across the border bridge. Broad gauge trains to Haparanda yard are mainly vans, whose contents are transshipped to standard gauge vans. Although no official document has been seen, it is understood that all transshipment has taken place at Haparanda since autumn 2012 because the certificate for the 70 ton gantry crane at Tornio yard is said to have expired at the end of 2012. Thus there are no longer any Swedish freight trains to Tornio. According to a Swedish driver, the only standard gauge activity to be expected in Tornio is the occasional transfer (only a few times a year) of track machines, which are re-gauged. A Finnish diesel shunts Haparanda normally once or twice every weekday. The upgrading of Boden - Morjärv - Kalix and building of a new line Kalix - Haparanda and electrification of both is complete. The last train Morjärv - Karungi - Haparanda operated 8 December 2012. The old line is now isolated and the track will be removed when the weather permits.
Electrification work on the the Finnish side, which includes the cross-border section, started at the beginning of April 2023.

Turku/Åbo VR - Stockholm Värtan TRV

[D] Freight only. Train Ferry (Sea Wind Line). Opened 13 June 1989. Closed 31 December 2011. Equipment for bogie replacement in Turku.