Search results

From EGTRE
Jump to navigationJump to search
View ( | ) (20 | 50 | 100 | 250 | 500)
  • ===Rully (Chagny (Poste 1)) – Chagny (west side platforms)=== ...
    3 KB (511 words) - 21:28, 16 December 2023
  • | 846630/1 | 846610/1 ...
    9 KB (1,402 words) - 23:30, 29 January 2024
  • Note that from 1 July 2021 to some-time in 2023, due to long term engineering works there is ...tood better from [https://www.gleisplanweb.eu/show.php?Map=Charleroi&Index=1&Height=1215&Width=2100 the Gleisplan website track plan]. ...
    5 KB (877 words) - 14:02, 14 March 2024
  • Some of these departures are from Udine Platform 1, which could suggest use of the normal and not the obscure route, in this c ...t to right, in the case of departures from the east end of Udine station a 1 means the direct route, 2 is for Cividale and 3 towards Trieste leading to ...
    5 KB (716 words) - 15:48, 3 February 2024
  • ...' trains to and from Frankfurt (Main) Hbf via Mainz normally use platforms 1 or 3. ...
    3 KB (447 words) - 11:33, 26 March 2024
  • ...used can be worked out by which platform is used at Grimmenthal: platforms 1 & 2 for the eastern connection and 3 & 4 for the western one. ...ith the exception of the 21:10 from Meiningen which terminates in platform 1. In addition, the 06:28 Grimmenthal – Erfurt Hbf starts from platform 4, th ...
    5 KB (692 words) - 14:13, 14 February 2024
  • ...rger Strand. In 2024, the ''Kieler Woche'' takes place between 21 June and 1 July. Timings are expected to be published in due course on a special ''RB7 ...rom Germany 17-21 and 26-28 December 2023; 2-4 January, 25-29 March and SX 1 April - 3 November 2024 (generally one or two days earlier from Sweden/Denm ...
    7 KB (1,038 words) - 13:52, 15 April 2024
  • Lev (Lv, дв); 100 stotinki = 1 Lv The National Railway Infrastructure Company ([https://www.rail-infra.bg/en/1 NRIC]), Национална компания "Железопътна инфраструктура" (НКЖИ). ...
    10 KB (1,461 words) - 21:14, 17 February 2024
  • [D] Passenger service withdrawn from 1 August 2017. CFR operated to Vršac. ...e of two daily train pairs, operated by ŽS, was withdrawn with effect from 1 September 2014. ...
    1 KB (216 words) - 19:01, 21 April 2024
  • * Alfa Lancia 4 - Acerra (Circumvesuviana): 1 February 2005 *310 Priverno-Fossanova – Terracina (1 October) again due to a landslide ...
    7 KB (986 words) - 21:26, 17 February 2024
  • ...en a passenger train since April 1945 and it had closed to freight on June 1 1996 [D] This section carries Trilex trains on a 1 km long section of the Bischofswerda - Zittau line through the Czech Republ ...
    7 KB (1,070 words) - 22:20, 23 April 2024
  • ...ed on 14 November 2007. The whole CTRL is now dubbed HS1 ("High Speed 1"). Internal services between London St.Pancras International and desti ...ct and London Underground have three separate pairs of stations: Terminals 1-2-3, Terminal 4 and Terminal 5). ...
    11 KB (1,620 words) - 21:43, 17 February 2024
  • {{Map Refs ERA-E}} {{Map Refs ERA-R-1}} (Frederiksværkbanen: Lokalbanen A/S) (ERA-E 41B5; ERA-R 15B5) DK24/1 ...
    5 KB (880 words) - 09:59, 1 May 2024
  • * Through traffic ceased for the first time after World War 1 around 1920, because of the Treaty of Trianon, when Hungary had to release ...ed land slide on the Austrian side the through goods traffic was halted on 1 September 1960; after that the line was completely removed between the bord ...
    5 KB (733 words) - 20:53, 7 January 2024
  • *Inexpensive plans of major cities at e.g. 1:20,000 (unfortunately lacking urban transport information) are published by ...ypically operate on a few km of track in a public park on weekends between 1 May and the start of the new school year. For details, see the Web site (pa ...
    21 KB (3,264 words) - 21:44, 17 February 2024
  • {{Map Refs ERA-E}} {{Map Refs ERA-R-1}} [TCE 693] (ERA-E 21C1; ERA-R 42C2) PT24/1 ...
    3 KB (457 words) - 20:43, 4 May 2024
  • ...daily) during the summer and also on certain dates at holiday times. From 1 June 2012 these trains ran daily. In 2019-2020, these trains (087Б Minsk-Ri ...
    1 KB (175 words) - 21:10, 20 November 2022
  • ...l ones operated by LG/RZD/CFM/UZ etc) and is split up into five sections - 1. City Lines (suburban trains around Minsk) / 2. Regional Lines Economy (reg The passenger service between Krychaw-1 and Surazh (Russia) was cut back to Byalynkavichi (Belarus), just south of ...
    7 KB (955 words) - 21:46, 17 February 2024
  • ...railways, inter-urban bus routes, ferries, cable cars and chair lifts on a 1:301000 relief map of Switzerland. A new approx. 1.4 km section of underground line on the metre-gauge LEB (Lausanne–Echallens ...
    46 KB (7,195 words) - 13:10, 22 May 2024
  • ...closed. RENFE worked to Barca de Alva until the service was withdrawn from 1 January 1985. CP services ceased in 1988. A plan to reopen Pocinho to Barca ...ire Torre das Vargens - Elvas - Badajoz passenger service was withdrawn on 1 January 2012. Entroncamento to Portalegre reopened on 25 September 2015 for ...
    3 KB (465 words) - 16:28, 18 July 2023
View ( | ) (20 | 50 | 100 | 250 | 500)